Installation Instructions Janfire Pellet Boiler Integral Typ 25
IA 32580002 EN_Ver5
Janfire 2014
15(25
)
Installation example with store tank
A
Thermostat mixer temperature limiter
H
Circulation pump
B
Domestic hot water supply
C
Inlet cold water
K
Mixing Valve
D
Expansion vessel
L
Return radiator
E
Radiator
O
Thermo valve
Note
Before starting the boiler ensure that the system is filled with water, that electrical
connections are correct and that pumps are functioning.
Note
The tube system should be rinsed out before the boiler is connected in order to avoid
damage from contamination to pumps and valves.
4.4 Burner
To install the burner see the burner’s installation instructions below.
4.5 Filling with Water
Filling with water should be done using a fixed connection to expansion connections or with the help of a pipe
in the drain valve.
A
B
C
D
E
K
H
H
L
O