background image

Page 3

12.  When installing a draft hood or a painted vent 

cap use the slotted holes in the clips as guides to 

drill three (3) 1/8" diameter holes in the stack. Be 

sure stack is seated properly to the transition plate 

before drilling the holes into place.

13.  Figure 7 shows a cross-section of the finished 

installation.

14.  Restore the main gas supply to the heater. Turn on 

electrical power to the heater.

15.  Test the heater for proper operation before leaving 

the job site.

Replacement Kit List

DESCRIPTION

R0491601-05*

R0499601-05

Vent Stack Pipe

1

--

Vent Cap

1

--

Draft Hood

--

1

Clip, Vent Cap / Draft Hood

3

3

Plate, Flue Transition

1

1

Screw, 10-16 X 5/8, Steel, Hex 

Washer Head

10

10

Instructions

1

1

* If your R0491601-05 kit is supplied with a painted vent cap,  

   the kit will not require the vent stack pipe.

F.   Replacement Kit List

 

The following table is for your reference. To order 

additional parts, please contact your local Jandy 

Distributor. 

Vent Cap Stack

Top Enclosure

Vent Cap

Transition Plate

Flue Collector

Figure 7.  Cross-Section of Assembled Installation

Reviews: