Page 3
12. When installing a draft hood or a painted vent
cap use the slotted holes in the clips as guides to
drill three (3) 1/8" diameter holes in the stack. Be
sure stack is seated properly to the transition plate
before drilling the holes into place.
13. Figure 7 shows a cross-section of the finished
installation.
14. Restore the main gas supply to the heater. Turn on
electrical power to the heater.
15. Test the heater for proper operation before leaving
the job site.
Replacement Kit List
DESCRIPTION
R0491601-05*
R0499601-05
Vent Stack Pipe
1
--
Vent Cap
1
--
Draft Hood
--
1
Clip, Vent Cap / Draft Hood
3
3
Plate, Flue Transition
1
1
Screw, 10-16 X 5/8, Steel, Hex
Washer Head
10
10
Instructions
1
1
* If your R0491601-05 kit is supplied with a painted vent cap,
the kit will not require the vent stack pipe.
F. Replacement Kit List
The following table is for your reference. To order
additional parts, please contact your local Jandy
Distributor.
Vent Cap Stack
Top Enclosure
Vent Cap
Transition Plate
Flue Collector
Figure 7. Cross-Section of Assembled Installation