7
Bl
k
Rd
Fan
OV PO
S
B A
R
On/O ff
O utp ut
Flow
Sal t
R
R
O n /O f f
O u tp u t
Fl ow
Sal t
R
Cell should be the last
piece of equipment
Maximum 15 feet
Water Flow
Water Flow
Minimum 15 inches
Location: Hard Wired Unit
Power Pack and Cell should be
no more than 15 feet apart.
Cell should be last item on
equipment pad.
Allow 15 inches minimum of
straight pipe.
Notes:
Bl
k
Rd
Fan
OV PO
S
B A
R
O n/Of f
Ou tpu t
Fl ow
Salt
R
R
O n /O f f
O u tp u t
F lo w
Sal t
R
Cell should be the last
piece of equipment
Maximum 15 feet
Water Flow
Water Flow
Minimum 2 feet 6 inches
Location: Plug-In Unit
Power Pack and Cell should be
no more than 15 feet apart.
Cell should be last item on
equipment pad.
Provide a minimum 2 feet 6 inches
for locating Cell and Pod.
Pod should be up stream of the
Cell on same trunk as the Cell
Pod should be up
stream of the Cell on
the same trunk.
10”
Summary of Contents for AquaPure Ei
Page 1: ...1 AquaPure Ei Chlorine Generator Workbook...
Page 2: ...2...
Page 24: ...24 Notes Maintenance Weekly...
Page 26: ...26 AquaPure Ei Troubleshooting Sections references are for the installation manual...
Page 27: ...27 AquaPure Ei Troubleshooting Sections references are for the installation manual...
Page 28: ...28 AquaPure Ei Troubleshooting Sections references are for the installation manual Notes...
Page 30: ...30 Replacement Parts and Exploded Views...
Page 31: ...31...
Page 32: ...32 AquaPure Ei Workbook 7 10 AquaPure Ei Workbook 7 10...