Remove all contents from packaging and inspect to ensure no damage was incurred during shipping. Your 2x2 package
should include the following:
operating
instructions
(
before
you
begin
)
description
part
#
qty
OPERATOR’S MANUAL
LIT102B
1
SHUNT INSTRUCTIONS
06958
1
WARRANTY CARD
0070342
1
2.5 MM HEx KEY
0151255
1
4MM HEx KEY
70587
1
5MM HEx KEY
70588
1
6MM HEx KEY
058112
1
8MM COMBINATION WRENCH
0151219
1
KNOB AND SPOKE HANDLE
07018
3
SAFETY STRAP
06798
1
KNOCK-OUT WEDGE
07517
1
SAFETY AND MAINTENANCE CD
06814
1
#2MT ARBOR ASSEMBLY
07504
1
COOLANT BOTTLE ASSEMBLY
0151511
1
3/16" PILOT PIN 1" D.O.C.
16001
1
3/16" PILOT PIN 2" D.O.C.
16002
1
1/4" PILOT PIN 1" D.O.C.
16003
1
1/4" PILOT PIN 2" D.O.C.
16004
1
getting
started
CAUTION!
always
disconnect
2
x
2
from
power
source
before
making
adjustments
.
Assemble three spoke handles (item #404) to feed hub.
NOTE:
Feed hub assembly is mounted on right side of machine
frame – if necessary, it can be reversed for lefthand operation by simply removing the fastener (item #402) and hub (item
#401) from frame. Remove hub pinion shaft from right side of frame and insert it into left side of frame. Replace hub
and fastener into frame and tighten securely.
Install the arbor into the drill motor by inserting the arbor body into the spindle. By turning the arbor while inserting, the
arbor tang will properly line up in the spindle. The stop rod (item #911) should be between the inducer pin (item #904.3)
and the hose connection (item #904.2) when properly installed. Turn the arbor until it bottoms out in the spindle and
then tap lightly with a plastic hammer to secure.
To install coolant bottle, use bracket (item #611) to slide the coolant bottle onto the two retaining screws (item #614),
located on the right side of drill. Install the free end of hose onto hose connection (item #904.2) on the arbor.
7
what
you
should
know
before
you
drill
1. Type of material to be drilled, Brinnell or Rockwell hardness, material thickness and position should all be determined
to ensure proper selection of Slugger cutting tools, RPM, coolant and drilling time.
2. Remove any excessive mill scale or rust from surface to be drilled.
3. Material that has been flame cut may have become heat-treated and therefore difficult to drill. Avoid drilling near
such areas whenever possible.
4. Drilling with the 2x2 in horizontal positions requires a special lubrication for Slugger cutters.
Consult Jancy Engineering for details.
Summary of Contents for 17982
Page 13: ...motor parts 13 REV C ...
Page 15: ...15 wiring diagrams Rev C ...