background image

11

|

8.  FURTHER GUIDANCE

Water Treatment
It is important that the water in the system is 
treated to maintain system efficiency and provide 
longevity for the heating element and associated 
system components.
Consideration should be given to power flushing 
(cleaning the system), treatment with inhibitor, system 
filtration and limescale prevention.
The water should be checked annually.
Failure to maintain good water quality will result in 
the product guarantee being null and void.

Balancing
Please balance the heating system ensuring correct 
water flow to each radiator and even heat distribution 
to each room.

Air Vent
Bleed air from radiator using the 
extended air vent, ensuring that 
the clear plastic tube is attached 
to the spigot to allow for easy 
collection of the water. Bleeding 
is achieved using a flat blade 
screw driver.

Summary of Contents for STRADA

Page 1: ...STRADA INSTALLATION AND MAINTENANCE INSTRUCTIONS LOW H2O RADIATOR FOR HEATING ONLY Tested in accordance with EN442...

Page 2: ...2...

Page 3: ...4 2 COMPONENT PARTS 4 3 TOOLS REQUIRED 4 4 INSTALLATION 5 5 FITTING THE CASING 8 6 REMOVING THE GRILLE 9 7 OPTIONAL EXTRAS 10 8 FURTHER GUIDANCE 11 9 MAINTENANCE 12 10 GUARANTEE 12 11 FAULT FINDING 1...

Page 4: ...nal Protection Equipment minimum requirement Gloves Safety Glasses Fixing Pack Drill 8mm Masonry Drill Bit Hammer Spirit Level Knife Screwdriver flat 1 INTRODUCTION The installation of STRADA Low H2 O...

Page 5: ...connection for the air vent is on the top of the heating element Minimum clearance from floor to underside of casing for STRADA equals h dimension The supplied fixings are suitable for solid wall cons...

Page 6: ...e air vent to the top 1 8th connection and moderately tighten 09 Fix the element assembly to the wall with the fixings provided Depending on the wall construction other fixings may be required Insert...

Page 7: ...0 18 10 11 53 29 15 16 78 53 20 21 103 79 13 The blanking plug can now be fitted to the unused connection If incorrectly connected the heating performance will be reduced and the thermostatic radiator...

Page 8: ...ert the first half moon decorative clip Locate the grille into front panel lower down into position and fix back bar CLICK 1 2 3 4 CLICK 02 Hook casing onto bottom of bracket Lift casing up and over t...

Page 9: ...tapping a wedge in to the back bar with a rubber mallet do not use a screwdriver 02 Remove the back bar 03 Remove the top grille 04 Replace top grille 05 Replace the back bar 06 Secure the back bar b...

Page 10: ...10 Arthritic Aid 01 Simply push over the end of TRV NOTE Arthritic aid only suitable for use with Jaga White JW TRV head 7 OPTIONAL EXTRAS...

Page 11: ...ion and limescale prevention The water should be checked annually Failure to maintain good water quality will result in the product guarantee being null and void Balancing Please balance the heating s...

Page 12: ...tant coating It is recommended that the heat exchanger is checked annually for the accumulation of dust hair and fibre Simply remove the thermostatic head and the casing and brush or vacuum the heat e...

Page 13: ...heating system ensuring adequate flow to each radiator and even heat distribution to each room Air in the heating system Bleed air from radiator using the extended air vent Lack of adequate airflow En...

Page 14: ...ompany reserves the right to charge the Buyer for replacement components and associated costs for claims falling outside the guarantee terms 5 Correct application and maintenance is also essential to...

Page 15: ...15 NOTES I Check out installation video on Jaga s website or youtube 2 Please phone 0I53I 63I 533 for help or assistance...

Page 16: ...44 1531 631 533 jaga jaga co uk www jaga co uk JAGA UK Jaga House Orchard Business Park Bromyard Road Ledbury Herefordshire HR8 1LG STRADAINST1222 JAGA UK...

Reviews: