104
Cover the enclosure with a plastic foil and wooden cover plate.
During construction, this protection must remain in place.
Always install a plug for cleaning in the lower part of the p-trap in
order to allow quick disassembly.pour water into the condensate
collection pan and check if the liquid is drained properly. Otherwi-
se, check the inclination and look for possible blockages.
After installation of the subfloor and finished floor: install
the grille
Install the cover plate.
Make sure that the condensation water is drained quickly. Keep
the condensation drain clean and remove obstacles that can
prevent normal drainage.
Position the drain pipes without mechanical stress on the drain
connection of the unit.
The condensate drain system must be set up with an adequate
p-trap in order to prevent the infiltration of odours.
Remove the cover plate and foil before start up of the unit.
17
15
18
16
20
19
INSTALLATION OF THE CONDENSATE DRAIN
COMPLETE INSTALLATION FOR INSTALLING FLOOR
FINISHING THE INSTALLATION
3 cm/m
Summary of Contents for Clima Quatro Canal H19
Page 2: ...NL PG 3 PG 29 PG 55 PG 81 FR DE EN 2...
Page 3: ...INSTALLATIEHANDLEIDING Clima Quatro Canal H19 3...
Page 29: ...INSTRUCTION D INSTALLATION Clima Quatro Canal H19 29 29...
Page 55: ...INSTALLATIONHINWEIS Clima Quatro Canal H19 55...
Page 81: ...INSTALLATION INSTRUCTIONS Clima Quatro Canal H19 81...
Page 107: ...107 EN NOTES...