The condensate drain system must be set up with an adequate p-trap in order to prevent  odours.
Always install a plug for cleaning in the lower part of the p-trap in order to allow quick disassembly.
Position the drain pipes without mechanical stress on the drain connection of the unit.

9.2. ELECTRICAL CONNECTION 

 IMPORTANT!

The electrical connection of the unit must be carried out by a certified technician , in compliance with 
the local building codes. Non-conforming electrical connections releases Jaga N.V. from liability 
concerning damage to objects and persons.

 DANGER!

– 

  check that the voltage to each unit is 24VDC. The unit is designed for Direct Current only. In case 

24AC comes to the unit, a suited rectifier must be installed.

– 

   make sure that the power supply covers the total load of all units connected plus a margin of 10% to 

cover the start-up power.

– 

  if the unit is mounted on a metal surface, the ground connection must be installed in compliance 

with local regulations. The ground conductor must be longer than the other conductors so that it is 
the last one to release in the event the 
connection comes loose.

– 

  verify if  the supply cables are of adequate 

section for the maximum current requi-
red.

Once installation is complete:

bleed the air from the coil
make sure that there are no water leaks
insulate the valve connections and pipes with self-adhesive thermal insulation against condensation 
or install secondary drain pans .
pour water into the condensate  pan and check if the liquid is drained properly. If not, check te inclina-
tion and look for possible blockages.

1

3

2

0..10 V

SUPPL

Y

M

OTO

R

+ 24 V

GND

DC
DC

DC

[

[

blue

red
white

Summary of Contents for BRIZA 12

Page 1: ...BRIZA 12 STAND ALONE BUILT IN INSTALLATION INSTRUCTIONS BRIZA12 WALL AND CEILING...

Page 2: ...22 DECLARATION OF CONFORMITY JAGA N V Verbindingslaan 16 B 3590 declares under its sole responsibility that the product to which this declaration relates is in conformity with the following standards...

Page 3: ...duct before during or after product installation maintenance has been carried out by unauthorized people maintenance has been carried out by someone other thanJaga access to the unit has been restrict...

Page 4: ...lations Do not leave the packaging within reach of children INSTALLATION installation must be carried out by certified technicians Incorrect installation could cause product failure a reduced performa...

Page 5: ...ned to function as a fan coil for both heating and cooling applications any other use is strictly forbidden Installing the unit in an explosive environment is prohibited Decommissioning When the unit...

Page 6: ...eiling built in Electrical connection Secondary drain pan Option for ceiling built in Condensate drain pan standard for wall model Tangential fan The direction of the air flow is determined by the pos...

Page 7: ...7 1 DIMENSIONS WALL MOUNTED MODEL 7 1 1 Installation in a wall recess Briza 038 Briza 052 7 1 2 Wall mounting Briza 041 Briza 055 L CM BRIZA 038 BRIZA 052 19 27 39 47 BRIZA 041 BRIZA 055 29 37 49 57...

Page 8: ...a 052 7 3 BUILT IN MODEL WITH AIR OUTLET CORNER PIECE 1 3 C H B 1 2 min 5 min 5 min 5 min 5 min 5 min 5 B H max 99 max 99 9 9 7 4 7 4 min 3 H B 9 max 99 1 2 5 min 3 C H B 9 max 99 1 2 5 7 4 7 4 max 99...

Page 9: ...Y BULB TEMPERATURE F 69 8 F 73 4 F 77 0 F 80 6 F 84 2 F 87 8 F RH 40 37 4 F 37 4 F 37 4 F 37 4 F 37 4 F 39 2 F 50 37 4 F 37 4 F 37 4 F 37 4 F 39 2 F 42 8 F 60 37 4 F 37 4 F 39 2 F 39 2 F 42 8 F 46 4 F...

Page 10: ...on and a water drain near the lower connec tion it is recommended to bleed air from the coil before operation The type of wall determines what type of screw or plug should be used For installation on...

Page 11: ...on OPTION secondary drain pan for Briza Built In Ceiling BRIZA H38 ref 5127 00010001 BRIZA H52 ref 5127 00010002 Ceiling 15 2 8 5 29 32 1 7 64 2 128 95 3 5 29 5 21 5 25 32 5 3 64 3 47 64 1 3 16 1 31 3...

Page 12: ...st be installed make sure that the power supply covers the total load of all units connected plus a margin of 10 to cover the start up power if the unit is mounted on a metal surface the ground connec...

Page 13: ...nstall the grill The direction of the airflow is determined by the orientation of the grille Only for Briza Ceiling with enclosure fasten the grill by the security clips Units with enclosure Position...

Page 14: ...ER maintenance must be carried out by qualified technicians do not insert sharp objects into the supply and return grilles the unit has sharp edges use gloves during maintenance DANGER Always use the...

Page 15: ...water flow Bleed air from the system 1 start the circulation pump and open the supply valve for a few minutes 2 stop the circulation pump 3 loosen the vent screw on the inlet collector and bleed the a...

Page 16: ...r complaints please contact your supplier or installer The copyright of these instructions is the property of Jaga DISSASSEMBLY INSTRUCTIONS SAFEGUARD THE ENVIROMENT Jaga cares about protecting the en...

Reviews: