1. Coupling, 2. Pipeline flange, 3. Seal, 4. Fastening bolt, 5. Nut, 6. Washer

 

 
 

4.3 OPERATION 

 

Inspection  couplings  with  hydrant  valve  type 8890  shall  be  used  in  accordance  with  the  requirements  for 

isolating valves. It is recommended  to  periodically  purge  the  coupling  with  fresh  water  (once  a  year)  to  assure 
full performance.  

For  servicing,  shutoff  valves  shall  be  installed  upstream  and  downstream  the  coupling.  The  installation 

location shall enable free access to the coupling for servicing and maintenance on the system. 

The  coupling  cannot  be  situated  in  a  location  subject  to  flooding.  The  device  shall  not  be  subject  to 

temperatures exceeding the allowable scope of work. 
 

Exceeding  the  operating  limits  of  the  fitting  may  result  in  damage  that  will  not  be  covered  by  the 

suretyship granted by the manufacturer. 

 

 

4.4 OH&S REGULATIONS 

 

The inspection couplings are eligible for the OHS guidelines and recommendation concerning installation of 

pipelines  and  devices  for:  water  supply  stations,  heat  power  plants,  water  treatment  plants,  sewage  treatment 
plants, pumping stations and other facilities, and eligible for the Polish Regulation concerning general OHS laws 
(use of personal protective equipment for hands, legs and head, and safety garment), especially at work with low 
or high temperature hazard. 
 
Misuse of this product is prohibited.
 
 

5 GUARANTEE CONDITIONS 

 

The  manufacturer  grants  guarantee  for  the  product  being  installed  and  operated  according  to  this  O&MM. 

The conditions and period of the guarantee is specified in the guarantee sheet. 

 

Summary of Contents for 8890

Page 1: ...by President of Factory JAFAR S A Failure to comply with the guidelines and instructions in this Operation and Maintenance Manual releases the manufacturer from all obligations liability and guarantee...

Page 2: ...ESCRIPTION 3 2 2 MATERIALS 4 2 3 DIMENSIONS 4 2 4 STANDARDS 5 2 5 ORDERING REGULATIONS 5 2 6 MANUFACTURE AND ACCEPTANCE 6 2 7 MARKINGS 6 3 PROTECTION STORAGE TRANSPORT 6 3 1 PROTECTIVE COATINGS 6 3 2...

Page 3: ...table water for industrial water at temperatures from 1 C to 70 C Available diameters DN50 DN250 for flanged versions Installation length PN EN 558 2012 Maximum medium flow rate 4m s Max working press...

Page 4: ...2012 2 Cover EN GJL 250 EN GJS 400 15 PN EN1561 2012 PN EN1563 2012 3 Cleanout opening CuZn39Pb1Al B PN EN1982 2010 4 Cleanout opening seal Technical fibre 5 Bonnet gasket EPDM NBR PN EN1629 2005 6 B...

Page 5: ...12 Founding Spheroidal graphite cast irons PN EN 10088 1 2014 Stainless steels List of stainless steels PN EN 1706 2011 Aluminium and aluminium alloys Foundings Chemical composition and mechanical pro...

Page 6: ...f the body chamber The marking contains the following data nominal diameter nominal pressure type of body material manufacturer trade mark an arrow showing flow direction The location on the valve spe...

Page 7: ...to perform installation works considering pipeline compensation due to temperature and pressure A coupling assembled and delivered by the manufacturer is ready for installation in the system Disassem...

Page 8: ...lowable scope of work Exceeding the operating limits of the fitting may result in damage that will not be covered by the suretyship granted by the manufacturer 4 4 OH S REGULATIONS The inspection coup...

Reviews: