Jafar 8890 Operation & Maintenance Manual Download Page 4

 

OPERATION AND MAINTENANCE MANUAL 

01-2016

 

4

 

2.2 MATERIALS 

 
List of materials used in the inspection couplings: 
 

Item 

Part name

 

Material

 

Reference standard

 

Body 

EN-GJL-250 
EN-GJS-400-15 

PN-EN1561: 2012 
PN-EN1563: 2012 

Cover 

EN-GJL-250 
EN-GJS-400-15 

PN-EN1561: 2012 
PN-EN1563: 2012 

Cleanout opening 

CuZn39Pb1Al-B 

PN-EN1982: 2010 

Cleanout opening seal 

Technical fibre 

 

Bonnet gasket 

EPDM/NBR 

PN-EN1629: 2005 

Bolt  

Steel Fe/Zn5 or stainless steel 

PN-EN ISO 4762: 2006 

Bolt plug 

Paraffin 

 

Valve seal  

EPDM/NBR 

PN-EN1629: 2005 

Hydrant valve 

AlSi 
Stainless steel 1.4401 

PN-EN1706: 2011 
PN-EN 10088-2: 2014 

 
 

 

2.3 DIMENSIONS 

 

 

 

Summary of Contents for 8890

Page 1: ...by President of Factory JAFAR S A Failure to comply with the guidelines and instructions in this Operation and Maintenance Manual releases the manufacturer from all obligations liability and guarantee...

Page 2: ...ESCRIPTION 3 2 2 MATERIALS 4 2 3 DIMENSIONS 4 2 4 STANDARDS 5 2 5 ORDERING REGULATIONS 5 2 6 MANUFACTURE AND ACCEPTANCE 6 2 7 MARKINGS 6 3 PROTECTION STORAGE TRANSPORT 6 3 1 PROTECTIVE COATINGS 6 3 2...

Page 3: ...table water for industrial water at temperatures from 1 C to 70 C Available diameters DN50 DN250 for flanged versions Installation length PN EN 558 2012 Maximum medium flow rate 4m s Max working press...

Page 4: ...2012 2 Cover EN GJL 250 EN GJS 400 15 PN EN1561 2012 PN EN1563 2012 3 Cleanout opening CuZn39Pb1Al B PN EN1982 2010 4 Cleanout opening seal Technical fibre 5 Bonnet gasket EPDM NBR PN EN1629 2005 6 B...

Page 5: ...12 Founding Spheroidal graphite cast irons PN EN 10088 1 2014 Stainless steels List of stainless steels PN EN 1706 2011 Aluminium and aluminium alloys Foundings Chemical composition and mechanical pro...

Page 6: ...f the body chamber The marking contains the following data nominal diameter nominal pressure type of body material manufacturer trade mark an arrow showing flow direction The location on the valve spe...

Page 7: ...to perform installation works considering pipeline compensation due to temperature and pressure A coupling assembled and delivered by the manufacturer is ready for installation in the system Disassem...

Page 8: ...lowable scope of work Exceeding the operating limits of the fitting may result in damage that will not be covered by the suretyship granted by the manufacturer 4 4 OH S REGULATIONS The inspection coup...

Reviews: