background image

1

INSTALL WALL BRACKET

Determine where the finished wall location will be. 

This measurement

is very important!  

Note: The rough-in measurement from the finished

wall is; 1-9/16" minimum and 2-7/16" maximum. This is a 7/8"

tolerance. See rough-in illustration above.   

2

INSTALL VALVE BODY

Mount VALVE BODY 

(1)

 to WALL BRACKET 

(2)

 as shown. Level and tighten 

SET SCREWS 

(3)

 to secure VALVE BODY 

(1)

 to WALL BRACKET 

(2)

.

Plumbers' Putty or Caulking

Adjustable Wrench

Phillips Screwdriver

TOOLS REQUIRED

Regular Screwdriver

1-9/16" MIN.

1/2" NPT UNION INLETS

8"

4"

2-9/16" D.

1"

7/8" MAX.

2-7/16"
MAX

Connect HOT water supply to LEFT INLET UNION 

(4)

 and COLD water supply

to RIGHT INLET UNION 

(5)

. Pipe connections are 1/2" NPT. Use sealant or

Teflon tape on pipe connections. 

Do not solder directly to valve body.

Secure WALL BRACKET 

(1)

 to cross brace of wall structure

at required height using six wood screws.

With valves closed open supply lines and check for leaks. Remove PLASTER

GUARDS 

(6)

 and open both valves and check for leaks.

HOT

COLD

WOOD SCREWS

FINISHED

WALL

FINISHED

WALL

CROSS BRACE

WALL STUDS

Close both valves and turn off water supplies. Replace PLASTER GUARDS 

(6)

and finish wall construction.

16"

2-3/16" D.

7-7/8"

H 9 6 5 1 3 4 D

ROUGHING-IN

DIMENSIONS

Channel Locks

Wall Mount Lavatory Faucet

LEVER HANDLE

CROSS HANDLE

Reviews: