1
INSTALL WALL BRACKET
Determine where the finished wall location will be.
This measurement
is very important!
Note: The rough-in measurement from the finished
wall is; 1-9/16" minimum and 2-7/16" maximum. This is a 7/8"
tolerance. See rough-in illustration above.
2
INSTALL VALVE BODY
Mount VALVE BODY
(1)
to WALL BRACKET
(2)
as shown. Level and tighten
SET SCREWS
(3)
to secure VALVE BODY
(1)
to WALL BRACKET
(2)
.
Plumbers' Putty or Caulking
Adjustable Wrench
Phillips Screwdriver
TOOLS REQUIRED
Regular Screwdriver
1-9/16" MIN.
1/2" NPT UNION INLETS
8"
4"
2-9/16" D.
1"
7/8" MAX.
2-7/16"
MAX
Connect HOT water supply to LEFT INLET UNION
(4)
and COLD water supply
to RIGHT INLET UNION
(5)
. Pipe connections are 1/2" NPT. Use sealant or
Teflon tape on pipe connections.
Do not solder directly to valve body.
Secure WALL BRACKET
(1)
to cross brace of wall structure
at required height using six wood screws.
With valves closed open supply lines and check for leaks. Remove PLASTER
GUARDS
(6)
and open both valves and check for leaks.
HOT
COLD
WOOD SCREWS
FINISHED
WALL
FINISHED
WALL
CROSS BRACE
WALL STUDS
Close both valves and turn off water supplies. Replace PLASTER GUARDS
(6)
and finish wall construction.
6
6
5
4
3
2
1
1
16"
2-3/16" D.
7-7/8"
H 9 6 5 1 3 4 D
ROUGHING-IN
DIMENSIONS
Channel Locks
Wall Mount Lavatory Faucet
LEVER HANDLE
CROSS HANDLE