1 0 9 6 3 6 A
1 0 9 6 3 6 A
Phillips Screwdriver
Teflon Tape
TOOLS REQUIRED
Regular Screwdriver
Roughing-in dimensions are for reference.
ROUGHING-IN DIMENSIONS
THREADED
INLETS (STOPS)
INLETS
5-1/2"
(140 mm)
OUTLETS 1/2" NPT
5-3/4"
(146 mm)
1-3/4"
(44 mm)
Turn off water at main supply.
CAUTION
By restricting HANDLE rotation and limiting the amount of hot water allowed to mix with the cold, the
HOT LIMIT SAFETY STOP (1) reduces risk of accidental scalding. To set the maximum hot water
temperature of your faucet, all you need to do is adjust the setting on the HOT LIMIT SAFETY STOP (1).
1
51
31
19
75
31
0
1
5
1
3
1
1
9
7
5
3
1
1
5
1
3
1
1
9
7
5
3
1
4
COLDER
(Larger Numbers)
0 1 3 5 7 9 11 13 15
HOTTER
(Smaller Numbers)
0 1 3 5 7 9 11 13 15
Turn CARTRIDGE STEM (2) to the OFF position (coldest setting) before making adjustment to HOT
LIMIT STOP (1). Use a flat blade screwdriver to pry free the HOT LIMIT SAFETY STOP (1). Pull
forward and rotate counterclockwise one number to limit hot water temperature.
Use ARROW (3) on CARTRIDGE (4) and NUMBERS (5) on HOT LIMIT STOP (1)
for indication.
1
5
1
5
4
4
3
3
2
2
2
INSTALL DIVERTER COVER AND VALVE COVER
1
INSTALL DIVERTER
When finished tiling the wall, remove PLASTER
GUARD (1). Remove two screws that secure the
DIVERTER LID (2) and remove Lid. Inspect the inside
surface of diverter port. Diverter port must be free of
any dirt. Clean if necessary.
Install DIVERTER (3) with SCREWS (4) removed from
DIVERTER LID (2).
Operate DIVERTER (3). DIVERTER (3) should slide in
and out smoothly.
1
2
4
3
DIVERTER
PORT
ADJUST HOT LIMIT STOP (MUST BE DONE PRIOR TO TRIM INSTALLATION)
5
BACK TO BACK INSTALLATION
(SEE ILLUSTRATION STEP 7 FOR REFERENCE)
6
TEST INSTALLED FAUCET
Remove Handle and Trim from Valve. See
step 3 for reference.
Remove PRESSURE BALANCE UNIT (5). Rotate
PRESSURE BALANCE UNIT (5) 180˚ so that the inlets
face up and the large outlet port faces down.
Push PRESSURE BALANCE UNIT (5) in casting make
sure inlets line up with holes in bottom of casting. Top
flange should butt up against top of casting.
Reassemble FIXATION RING (4) and CARTRIDGE (1).
Turn VALVE "off".
With HANDLE in "off" position, turn on water supplies
and check all connections for leaks.
Operate HANDLE and flush water lines thoroughly. Pull
DIVERTER and check SHOWER for proper operation.
Check SPOUT and SHOWER connections for leaks.
5
6
1
4
5
6
3
Thread DIVERTER KNOB (1) onto diverter stem.
Install HANDLE ADAPTER (2) onto VALVE STEM (3) and secure with
SCREW (4).
Align LEVER HANDLE (5) so lever is facing down and tighten SET
SCREW (6) with hex wrench to secure LEVER HANDLE (5).
Thread LEVER (7) into LEVER HANDLE (5) to complete handle
installation.
Adjustable Wrench
Channel Locks
7
2
HEX WRENCH
(SUPPLIED)
Hex Wrench
(supplied)
1-5/8" TO 3-1/4"
FINISHED WALL
BOTTOM OF
TUB
1/2" I.P.S.
7-1/4" D.
1/2" NPT
18" OPTIONAL
"SEE
ILLUSTRATION"
SHW
TUB
3
INSTALL TRIM
Figure 1.
Mount ESCUTCHEON HOLDER (1)
and gasket to valve body with SCREWS (2).
Mount ESCUTCHEON SUPPORT (3) to
ESCUTCHEON HOLDER (1) with SCREWS (4).
Figure 1.
Figure 2.
Figure 3.
5
6
7
1
3
4
2
Figure 2.
Align PINS (5) on back side of
ESCUTCHEON (6) with the FOUR HOLES (7)
in ESCUTCHEON SUPPORT (3). Press
ESCUTCHEON (6) flush against finished wall.
Figure 3.
Push CAP (1) over VALVE CARTRIDGE (2) until seated
against stop. Push CAP (3) over DIVERTER (4) until
seated against stop.
1
2
3
4
3