22
www.jacuzzi.com
Assembly
Instructions Cont’d
When determining a location for your sauna, please keep in mind the following:
1.
The main power cord on the sauna must be easily accessible.
2.
The location must be dry and level.
3.
Panels should be installed in the following order:
1) Floor
4) Right Side Wall
7) Roof
2) Back Wall
5) Under Bench Support
8) Front Wall Glass
3) Left Side Wall
6) Bench
1.
Place the bottom floor panel on the ground
near the location you will using the sauna.
Make sure the front of the floor is in the desired
location of the door. The metal threshold
indicates the front of the sauna.
1.
Connect the back panel to the floor panel by lining up
the back panel on the groove of the floor panel.
1 - Location of Sauna and Installation Order
2 - Placing Floor Panel
3 - Connecting the Back Panel to
the Floor Panel
Assembly of the sauna requires a minimum of two adults to complete. As noted, a third person is reccomended
when installing the glass components. Please read the instructions thoroughly before and during assembly to
ensure proper installation of the unit. Wearing booties to cover your shoes will protect the wood from getting
scuffed or stained
Jacuzzi
®
Saunas JS -3i