TOWERS AND DOORS INSTALLATION
THESE INSTRUCTIONS ARE FOR SUMMER RAIN II
2 WALL AND 3 WALL UNITS WITH AND WITHOUT
AIR FEATURE OPTION.
Refer to COMPONENT IDENTIFICATION on page 4 to
help identify parts.
STEP 1
On the 2 wall unit attach the wall jamb to the water tower
adjacent to the side wall. Then insert the wall post into
the wall jamb.
Do not screw jamb and post together
at this time.
Position each tower on mounting pad on
base.
For the water towers, feed hot and cold supply line
through appropriate holes in bottom of tower. For air
feature, feed air line through large hole on bottom cap of
the air tower. Check with a level when attaching towers
to base. Tighten tower base bolts after leveling (1 bolt
per shower tower and 2 bolts for air tower).
WASHER
BOLT (5/16")
COLD
HOT
SHOWER
TOWER (2X)
FLOW
SWITCH
CABLE*
* ONLY WITH AIR TOWER UNITS
WASHER (2)
BOLT 5/16" (2)
AIR SUPPY PIPE
AIR
TOWER
CONTROL
PANEL CABLE
WATER TOWER DETAIL
REAR OF CONTROLLER
BLACK LEAD
STEP 3 (WITH AIR FEATURE ONLY)
Route flow switch cables up through water towers and
connect to flow switch on both shower towers.
FROM
CONTROL
BOX
FLOW
SWITCH
STEP 2 (WITH AIR FEATURE ONLY)
Route control panel cable up through air tower and
connect to control panel.
8
Jacuzzi Whirlpool Bath
©
BZ00000 03/05
JAMB AND
WALL POST