TOWERS AND DOORS INSTALLATION
STEP 5
Two shut-off valves are provided per water tower. To
hook up supply lines, unscrew valves from braided line.
Using thread sealant, screw each valve to stub out at
bottom of tower. Then reconnect braided line using
provided gasket. Do not twist or kink supply lines when
connecting. Perform this step for both water towers.
SHUT OFF
VALVES
(PROVIDED)
COLD
HOT
CAULK AROUND SUPPLY
PIPING AND INSIDE TOWER BASE
STEP 4 (WITH AIR FEATURE ONLY)
Attach air supply pipe to air tower plumbing.
10
Jacuzzi Whirlpool Bath
©
BY82000 03/05