TOWERS AND DOORS INSTALLATION
THESE INSTRUCTIONS ARE FOR SUMMER RAIN
UNITS WITH AND WITHOUT AIR FEATURE OPTION.
REFER TO COMPONENT IDENTIFICATION ON PAGE
4 TO HELP IDENTIFY PARTS.
All wall finish tiling, trim, and sealing should be
completed before beginning this part of the installa-
tion.
STEP 1
Position each tower on mounting pad on base. For the
shower towers, feed hot and cold supply line through
appropriate holes in bottom of tower. For air feature,
feed air line through large hole on bottom cap of the air
tower. Check with a level when attaching towers to base.
Tighten tower base bolts after leveling (1 bolt per shower
tower and 2 bolts for air tower).
WASHER
BOLT (5/16")
COLD
HOT
SHOWER
TOWER (2X)
FLOW
SWITCH
CABLE*
* ONLY WITH AIR TOWER UNITS
WASHER (2)
BOLT 5/16" (2)
AIR SUPPY PIPE
AIR
TOWER
CONTROL
PANEL CABLE
WATER TOWER DETAIL
REAR OF CONTROLLER
BLACK LEAD
STEP 3 (WITH AIR FEATURE ONLY)
Route flow switch cables up through water towers and
connect to flow switch on both shower towers.
FROM
CONTROL
BOX
FLOW
SWITCH
STEP 2 (WITH AIR FEATURE ONLY)
Route control panel cable up through air tower and
connect to control panel.
8
Jacuzzi Whirlpool Bath
©
BY82000 03/05