Tempstar LT/NB/S/SDS Technical Manual 7610-011-86-35
Issued: 12-07-2007 Revised: N/A
SECTION 1: SPECIFICATION INFORMATION
OPERATING CAPACITIES
PERFORMANCE/CAPABILITIES
OPERATING CAPACITY:
RACKS PER HOUR
57
DISHES PER HOUR
1425
GLASSES PER HOUR
1425
OPERATING CYCLE (SECONDS):
MINIMUM (OTHER CYCLE TIMES ARE AVAILABLE)
WASH TIME
45
RINSE TIME
11
DWELL TIME
2
TOTAL CYCLE TIME
60
TANK CAPACITY:
WASH TANK (GAL)
8.0
WASH TANK (L)
30.3
RINSE TANK (TEMPSTAR/TEMPSTAR SDS) (GAL) 3.0
RINSE TANK (TEMPSTAR/TEMPSTAR SDS) (L)
11.4
STEAM REQUIREMENTS:
COIL SIZE
3/4”
STEAM FLOW PRESSURE (P.S.I.)
10-20
CONSUMPTION @ 15 P.S.I. (LBS/HR)
45
ELECTRICAL REQUIREMENTS
WASH MOTOR HP
3/4
NOTE: Always refer to the machine data plate for specific
electrical and water requirements. The material provided
on this page is for reference only and may be subject to
change without notice.
WATER REQUIREMENTS
TEMPSTAR/TEMPSTAR SDS:
WASH TEMPERATURE (MINIMUM)(°F)
150
WASH TEMPERATURE (MINIMUM)(°C)
66
RINSE TEMPERATURE (MINIMUM)(°F)
180
RINSE TEMPERATURE (MINIMUM)(°C)
83
INLET WATER TEMPERATURE:
12KW RINSE HEATER (°F)
140
12KW RINSE HEATER (°C)
60
14KW RINSE HEATER (°F)
110
14KW RINSE HEATER (°C)
44
FLOW PRESSURE (PSI)
20
±
5
WATER LINE SIZE (NPT)
3/4”
DRAIN LINE SIZE (NPT)
1 1/2”
TEMPSTAR LT:
WASH TEMPERATURE (MINIMUM)(°F)
130
WASH TEMPERATURE (MINIMUM)(°C)
55
RINSE TEMPERATURE (MINIMUM)(°F)
130
RINSE TEMPERATURE (MINIMUM)(°C)
55
INLET WATER TEMPERATURE (°F)
130
INLET WATER TEMPERATURE (°C)
55
FLOW PRESSURE (PSI)
20
±
5
WATER LINE SIZE (NPT)
3/4”
DRAIN LINE SIZE (NPT)
1 1/2”
MINIMUM CHLORINE REQUIRED (PPM)
50
TEMPSTAR NB/TEMPSTAR S:
WASH TEMPERATURE (MINIMUM)(°F)
150
WASH TEMPERATURE (MINIMUM)(°C)
66
RINSE TEMPERATURE (MINIMUM)(°F)
180
RINSE TEMPERATURE (MINIMUM)(°C)
83
INLET WATER TEMPERATURE (°F)
180
INLET WATER TEMPERATURE (°C)
83
FLOW PRESSURE (PSI)
20
±
5
WATER LINE SIZE (NPT)
3/4”
DRAIN LINE SIZE (NPT)
1 1/2”
2
Summary of Contents for Upright Door Dishmachines Tempstar Series
Page 2: ......
Page 9: ...1 SECTION 1 SPECIFICATION INFORMATION...
Page 16: ...8 SECTION 2 INSTALLATION OPERATION INSTRUCTIONS...
Page 22: ...14 SECTION 3 PREVENTATIVE MAINTENANCE...
Page 24: ...16 SECTION 4 TROUBLESHOOTING SECTION...
Page 27: ...19 SECTION 5 PARTS SECTION...
Page 67: ...59 SECTION 6A ELECTRICAL SCHEMATICS FOR TOP MOUNT UNITS...
Page 83: ...75 SECTION 6B ELECTRICAL SCHEMATICS FOR SIDE MOUNT UNITS...
Page 93: ...85 SECTION 6C ELECTRICAL SCHEMATICS FOR OPTIONS...
Page 96: ...88 SECTION 7 JACKSON MAINTENANCE REPAIR CENTERS...
Page 103: ......