iii
07610-004-33-05-E
Revision
Letter
Revision
Date
Made
by
Applicable
ECNs
Details
A
9-21-16
JH
N/A
Initial release of manual.
B
10-25-16
JH
N/A
Corrected delime instructions.
Corrected P/Ns for item #6 on pg. 42.
Updated pg. 13 to change the pressure regulator from standard to optional.
Updated Miscellaneous Electrical Components page.
Added a Door Assemblies page.
Added a Frame Assembly page.
Added Display Fault Codes.
C
1-19-18
JH
8438
8504
8524
8526
8546
8547
8569
8570
8578
8579
Added the Energy Recovery unit to the manual.
Changed maximum water hardness to 3 GPG.
Added a Connection Points section to pg. 24.
Changed detergent connection point location on pg. 24.
Added links to external device and exhaust fan timer instructions to pg. 25.
Added Steam unit dimensional drawings.
Changed inlet steam flow pressure to 10-30 PSI.
Changed plumbing throughout to single-point connection.
Added dispenser connection fuses and P/Ns to pg. 41.
Updated Pawl Bar Assembly, pg. 57.
Corrected Rack Paddle Assembly, pg. 58.
Replaced item #12 on pgs. 59 and 60 with new part.
Added Drive Plate components to pg. 60.
Added communication cable to Display Assembly page.
Added a Frame Assembly page.
Replaced item #7 on pg. 66 with new part.
Changed P/N of Drive Link on pg. 67.
Added Booster Heater Add-on Kit to pg. 70.
Updated schematics.
D
3-13-18
JH
N/A
Updated dimensional drawings with depiction of drain air-gap and associated
specifications.
Updated Drain Line Connection section to be more descriptive and added
depiction of drain air-gap and associated specifications.
E
9-10-20
JH
8553
8586
8609
8615
8623
8626
8627
8629
8654
8735
8736
Added 600 V unit to the manual.
Added HH unit to the manual.
Updated Electrical Requirements pgs.
Added instructions hyperlink icon and linked to applicable documents
throughout.
Added section on adjusting doors.
Added section on motor rotation.
Added section on table limit switch option.
Revised connection points section.
Updated curtain sizes.
Corrected delime instructions.
Added high-limit thermostat.
Updated inlet plumbing assemblies.
Updated Wash and Pre-wash Arm sections.
Updated pre-wash plumbing assembly.
Created Rack Rails section and added all rails and components.
Updated schematics.
REVISION HISTORY