20
07610-003-78-18-N
DRAIN QUENCH KIT INSTRUCTIONS
INSTALLATION
3.
Connect user-supplied 115V cord (from facility power) into solenoid box as shown below:
4. Connect cold water to inlet side of solenoid valve.
DRAIN QUENCH SYSTEM
IF THERE ARE ANY ISSUES AFTER INSTALLATION, PLEASE CONTACT
TECHNICAL SERVICE AT 1-888-800-5672.
5. Secure all electrical (ensure connection is to 120V facility power) and plumbing connections.
6. Restore water and power to the machine and verify drain quench performance.
Power cannot
be taken from
the machine!
!
CAUTION
Summary of Contents for CREW 44
Page 2: ......
Page 6: ......
Page 81: ...72 07610 003 78 18 N STEAM BOOSTER HEATER SCHEMATICS ...
Page 84: ...75 07610 003 78 18 N 208 230 460 VOLT 60 HZ 3 PHASE 44 ELECTRICALLY HEATED SCHEMATICS ...
Page 85: ...76 07610 003 78 18 N 208 230 VOLT 60 HZ 1 PHASE 44 ELECTRICALLY HEATED SCHEMATICS ...
Page 86: ...77 07610 003 78 18 N 208 230 460 VOLT 60 HZ 3 PHASE 44 STEAM HEATED SCHEMATICS ...
Page 87: ...78 07610 003 78 18 N 208 230 VOLT 60 HZ 1 PHASE 44 STEAM HEATED SCHEMATICS ...
Page 88: ...79 07610 003 78 18 N 208 230 460 VOLT 60 HZ 3 PHASE 66 ELECTRICALLY HEATED SCHEMATICS ...
Page 89: ...80 07610 003 78 18 N 208 230 VOLT 60 HZ 1 PHASE 66 ELECTRICALLY HEATED SCHEMATICS ...
Page 90: ...81 07610 003 78 18 N 208 230 460 VOLT 60 HZ 3 PHASE 66 STEAM HEATED SCHEMATICS ...
Page 91: ...82 07610 003 78 18 N 208 230 VOLT 60 HZ 1 PHASE 66 STEAM HEATED SCHEMATICS ...
Page 92: ...83 07610 003 78 18 N BLOWER DRYER 240V SCHEMATICS ...
Page 93: ...84 07610 003 78 18 N BLOWER DRYER 480V SCHEMATICS ...