INSTALLATION INSTRUCTIONS
STEAM EQUALIZING VENT
The steam equalizing vent is located on the back upper left corner of the
dishmachine. The vent should not be blocked or prevented from venting steam
off from inside of unit. Under-counter machines installed inside of cabinet
are not excluded from this requirement.
STEPS :
REFER TO FIGURE 2
1. Install 1-1/4 inch pipe to equalizing vent fitting and connect to
appropriate venting system. NOTE: Do not pipe steam line downward
toward floor, this will restrict venting of steam.
ELECTRICAL POWER CONNECTION
WARNING: All field wiring connections must conform to the Local and National
electrical codes. Install proper circuit breaker, wire and conduit size.
MACHINE DATA PLATE is located at top of inner door.
STEPS :
REFER TO FIGURE 2
1. Remove control box side panel and lay aside.
2. Make electrical connection through conduit hole provided at rear of
box and connect 440 VOLT, 60 HZ, 3 PHASE service to terminal block marked
LI, L2 and L3. Connect GROUND WIRE to grounding lug provided.
CAUTION: INJURY OR DEATH MAY OCCUR FROM SHOCK IF MACHINE IS NOT PROPERLY
GROUNDED.
WARNING: DO NOT CONNECT WILD/HOT LEG OF 3 PHASE POWER TO LI OR L2 . CHECK LEGS
TO GROUND FOR PROPER VOLTAGES.