Assembly (continued)
Please contact 1-800-800-4950 for further assistance.
13
6 Attaching the hook
•
Locate a ceiling beam that is sturdy enough to handle the load of the swing and the occupants (approximately
500lbs). Drill 2 vertical 5/32 inch pilot holes in the center of the ceiling beam, 46 inches apart. Insert the set hooks
(7) and screw them into the holes until no threads are exposed.
Note :
Ensure the alignment of the set hooks (7) are conducive to the intended swinging motion of the item.
Caution :
Incorrect installation of the ceiling hooks can cause the swing to fall and possibly cause serious injury to
occupants. Be sure to drill the correct size holes into sturdy wood beam.
•
Hang the chain (8) by open the quick link first then insert to the hook (7). Make sure the quick link is tightly locked.
7
7
Quick
link
7
Incorrect
Exposed
threads
Correct
No exposed
threads
8
7
8