background image

                                             Assembly and Operating Manual                                                    Explorer EDF 

    7 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 17 

 

-

 Charge the flight battery; connect the Equalizer 

lead using and adapter lead matching your charger 

(adapter lead not included). 

 
-Controller and then switch the transmitter off. 

 

 

 

 

 

 

 

 

 

 

 

 

Fig. 18   

 

- Switch the transmitter on, and move the throttle 

stick to the “Motor OFF” position. (Diagram MODE 

1 right throttle control stick) 

 

 

 

 

 

 

 

17 

18

Summary of Contents for Explorer EDF

Page 1: ...Assembly and Operating Manual Explorer EDF Specification Length 30 1 10 765MM Wing span 55 1 10 1400MM Flying weight 460g 16 1 2oz...

Page 2: ...4GHz radios systems are recommended similar to the unit included with our deluxe version The power for the receiver is drawn from the electronic speed controller s integral BEC system The electronic s...

Page 3: ...Assembly and Operating Manual Explorer EDF 3 Fig 1 Assemble the V tail Fig 2 Install V tail on fuselage Fig 3 Photo shows the finished view Fig 4 Lock the V tail with screws 1 2 4 3...

Page 4: ...EDF 4 Fig 5 Connect the control rods and control horns Fig 6 Photo shows the finished view Fig 7 Assemble the control rods to the servo and connect the rods with servo arms and control horns Fig 8 Pu...

Page 5: ...Manual Explorer EDF 5 Fig 9 Photo shows the cover on the servo Fig 10 Install the wing support bar into the main wings Fig 11 Lock the main wings with screws Fig 12 Connect the channel wire leads to t...

Page 6: ...n the fuselage Place the battery in the model of balancing do not connect it Make the Centre of Gravity on both sides Support the model at the marked C G and allow it to hang freely The model is corre...

Page 7: ...nnect the Equalizer lead using and adapter lead matching your charger adapter lead not included Controller and then switch the transmitter off Fig 18 Switch the transmitter on and move the throttle st...

Page 8: ...towards you and the rear edge of the elevator should rise Moving the aileron stick to the right you MUST check that the trailing edge of the right aileron rises the left aileron should go down If any...

Page 9: ...st few flights please wait for a day with no more than a gentle breeze A good flying site consists of a large flat open grassy field devoid of trees fences high tension overhead cables etc Repeat the...

Page 10: ...J POWER GROUP CO LTD 5th Floor A3 Building Xinjianxing Technology Industrial Park Fengxin Road Guangming Town Bao an Shenzhen City 518107 China Phone 86 755 33699201 Fax 86 755 33699203 www jpower hk...

Reviews: