background image

 

      

 

 

INSTALLATION

 

1

 

Installation

 

Dia.1.

 

1.

 

Un

-

screw the top section of the fitting.

 

2.

 

Turn on the on/off switch.

 

3.

 

Re

-

screw the top section of the fitting.

 

4.

 

Attach the pole to the fitting as illustrated.

 

5.

 

Remove the spike from the pole.

 

6.

 

Attach the spike to the pole in the posi-
tion illustrated.

 

7.

 

Place the fitting on the required position 
and test.

 

The LED light only can operate under a dark        
atmosphere.

 

 

 

Battery Replacement (If required).

 

Dia.02.

 

1.

 

Un

-

screw the top section of the fitting.

 

2.

 

Using screw driver (not supplied)          
un

-

screw the screws from the battery 

compartment.

 

3.

 

Open the battery compartment and      
remove the old  battery.

 

4.

 

Insert new  battery  and closed the       
battery compartment.

 

5.

 

Re

-

screw all the screws from the battery 

compartment

 

6.

 

Re

-

screw the top section of the fitting.

 

This product is suitable to use Nickel metal 
Hybrid battery, abbreviated NI

-

MH, any    

other batteries type are not accepted. 

 

Cleaning

 

-

 Use a clean dry soft or slightly damp cloth.

 

-

 Do not use abrasive cloths or polishes as this may 

cause damage to the product.

 

 

APPROVED

 

06/11//2019

 

ISSUE 1

 

Q.C

 

Maintenance

 

PD479, PD481,PD482

 

J D Williams & Company Limited is part of N Brown Group plc. Griffin House, 

40 Lever Street, Manchester, M60

 6ES

 

Dia.1

 

Dia.2

 

2

 

3

 

4

 

5

 

6

 

7

 

Reviews: