background image

Support: 855-473-7449 or 408-943-4100                                     Email: [email protected]

Page 6

5  Connect Power Cords

Do not plug the power cords into a power outlet yet.

 Connect a power cord to the back of one power sup-

ply� Place the cord in the plastic clamp and press the tab into the latch to lock it in place� Repeat the process for 

the second power supply and cord�

6  Connect SAS Cords

Plug the ES12 power cords into power outlets� 

Wait two minutes for the drives to start.

 The ES12 is com-

patible with several TrueNAS systems� Typical SAS cable connections for one or two ES12 expansion shelves to 

TrueNAS High Availability (HA) systems are shown here�

6.1  X-Series

Summary of Contents for TrueNAS ES12

Page 1: ...TrueNAS ES12 Expansion Shelf Basic Setup Guide Version 1 7...

Page 2: ...ive owners Contents 1 Unpacking the Unit 1 2 Become Familiar with the ES12 System 2 3 Rail Kit Assembly 3 3 1 Rail Extenders 3 3 2 Rail Spring 3 3 3 Attaching Rails to the Rack 4 4 Install Drive Trays...

Page 3: ...p to ten drive trays are packed in a cardboard tray Additional drivetrays are packed with the accessory kit Accessory kit with 2 IEC C13 to NEMA 5 15P power cords 2 IEC C14toC14 cords and a set of vel...

Page 4: ...ocate ID and fault The fault indicator is on during the initial power on self test POST and turns off during normal operation It turns on if the TrueNAS software generates an alert The ES12 has two ex...

Page 5: ...lation of the included rail extenders For these deeper racks install cage nuts on the outside rear of the rack The tabs on the cage nuts must be horizontal as shown Using the included bolts install th...

Page 6: ...the front of the rack aligning the pins on both ends of the rail with the mounting holes in the rack Swing the clamp latch closed to hold the rail in place Use two of the supplied screws to secure the...

Page 7: ...t SSD drives for read cache R if present Hard drives or SSD drives for data storage Air ba e ller trays to ll any remaining empty bays Install the rst drive tray in the top left drive bay Install the...

Page 8: ...e plastic clamp and press the tab into the latch to lock it in place Repeat the process for the second power supply and cord 6 Connect SAS Cords Plug the ES12 power cords into power outlets Wait two m...

Page 9: ...Support 855 473 7449 or 408 943 4100 Email support ixsystems com Page 7 6 2 M40...

Page 10: ...Support 855 473 7449 or 408 943 4100 Email support ixsystems com Page 8 6 3 M50...

Page 11: ...able by clicking Guide in the TrueNAS web interface or going directly to https www truenas com docs 9 Contacting iXsystems For assistance please contact iX Support Contact Method Contact Options Web h...

Page 12: ...Support 855 473 7449 or 408 943 4100 Email support ixsystems com Page 10...

Reviews: