background image

Support: 855-473-7449 or 408-943-4100                                     Email: [email protected]

Page 5

4  Install Drive Trays

Drive trays are used to mount drives in the chassis� Each drive tray has a status LED which is blue when the 

drive is active or a hot spare� The LED changes to amber if a fault has occurred� A tray must be placed in each 

drive bay to maintain proper air flow for cooling. If fewer than twelve drives are connected, empty “airbaffle” 

trays must be placed in the empty bays. A standard drive tray installation order simplifies support and is strong

-

ly recommended: 

• SSD drives for write cache (W), if present  

• SSD drives for read cache (R), if present  

• Hard drives or SSD drives for data storage  

• Air baffle filler trays to fill any remaining empty bays

Install the first drive tray in the top left drive bay. Install the next drive tray to the right of the first. Install re

-

maining drive trays to the right across the row. After a row is filled with drives, move down to the next row and 

start again with the left bay� This example shows the proper order for a write cache (W) SSD, a read cache (R) 

SSD, eight hard drives, and two empty air baffle trays.

To load an individual drive tray into a bay, press the blue button to open the latch� Carefully slide the tray into a 

drive bay until the left side of the latch touches the metal front edge of the chassis, then gently swing the latch 

closed until it clicks into place�

Summary of Contents for TrueNAS ES12

Page 1: ...TrueNAS ES12 Expansion Shelf Basic Setup Guide Version 1 7...

Page 2: ...ive owners Contents 1 Unpacking the Unit 1 2 Become Familiar with the ES12 System 2 3 Rail Kit Assembly 3 3 1 Rail Extenders 3 3 2 Rail Spring 3 3 3 Attaching Rails to the Rack 4 4 Install Drive Trays...

Page 3: ...p to ten drive trays are packed in a cardboard tray Additional drivetrays are packed with the accessory kit Accessory kit with 2 IEC C13 to NEMA 5 15P power cords 2 IEC C14toC14 cords and a set of vel...

Page 4: ...ocate ID and fault The fault indicator is on during the initial power on self test POST and turns off during normal operation It turns on if the TrueNAS software generates an alert The ES12 has two ex...

Page 5: ...lation of the included rail extenders For these deeper racks install cage nuts on the outside rear of the rack The tabs on the cage nuts must be horizontal as shown Using the included bolts install th...

Page 6: ...the front of the rack aligning the pins on both ends of the rail with the mounting holes in the rack Swing the clamp latch closed to hold the rail in place Use two of the supplied screws to secure the...

Page 7: ...t SSD drives for read cache R if present Hard drives or SSD drives for data storage Air ba e ller trays to ll any remaining empty bays Install the rst drive tray in the top left drive bay Install the...

Page 8: ...e plastic clamp and press the tab into the latch to lock it in place Repeat the process for the second power supply and cord 6 Connect SAS Cords Plug the ES12 power cords into power outlets Wait two m...

Page 9: ...Support 855 473 7449 or 408 943 4100 Email support ixsystems com Page 7 6 2 M40...

Page 10: ...Support 855 473 7449 or 408 943 4100 Email support ixsystems com Page 8 6 3 M50...

Page 11: ...able by clicking Guide in the TrueNAS web interface or going directly to https www truenas com docs 9 Contacting iXsystems For assistance please contact iX Support Contact Method Contact Options Web h...

Page 12: ...Support 855 473 7449 or 408 943 4100 Email support ixsystems com Page 10...

Reviews: