IVRA BTS c-Go Instruction Manual Download Page 19

 

English

 

19

 

 
Supported batteries 

Battery types 

Gel / AGM / LiFePO4 

Battery nominal voltage 

12V / 24V (if internal 24V charger present) 

Battery C5 capacity 

20 

 200 Ah 

Charge current (main charge phase) 

Max. 29% of C5 capacity 

Charge voltage (absorption phase) 

Gel: 14.4V(12V) or 28.8V(24V) 

AGM: 14.7V(12V) or 29.4V(24V) 

LiFePO4: 14.4V(12V) or 28.8V(24V) 

Charge current (post charge phase) 

Gel: 10% of main charge current 

AGM: 25% of main charge current 

LiFePO4: no post charge 

Discharge current 

Max. 20% of C5 capacity 

End of discharge voltage 

10.5V (12V) /  21V (24V) 

 
Supported external chargers to be tested 

Charger nominal voltage 

12V / 24V 

Test voltage 

12.5V (12V) / 25.0V (24V) 

Max. test charger current 

40A (12V) / 20A (24V) 

 

Summary of Contents for BTS c-Go

Page 1: ...1 BTS Battery Test System 2 4 Channel Instruction manual GB...

Page 2: ...w 5 4 BTS power on 6 5 Language selection 6 6 Battery test 8 6 1 Connect battery 8 6 2 Steps to start a battery test 8 7 Charger test 14 7 1 Connect charger 14 7 2 Steps to start a charger test 14 8 B...

Page 3: ...the test is finished An option is to write the result to a flash drive Another feature of the battery test system is testing 12V and 24V chargers Potential applications Battery quality control Recondi...

Page 4: ...attery E g to reduce risk of sparking Batteries are capable of providing a lot of energy in a short time span Prevent short circuits in any way For example walking over the cables or damaging the cabl...

Page 5: ...t channel 2 Battery input channel 1 Temperature sensor input channel 2 Temperature sensor input channel 1 Battery input channel 3 Battery input channel 2 Temperature sensor input channel 3 Temperature...

Page 6: ...wer entry connector after the power cord is connected Connect all battery cables to the inputs and the temperature sensor cables to the temperature sensor inputs 5 Language selection The BTS supports...

Page 7: ...English 7 In the next screen press Language In the next screen choose the required language...

Page 8: ...nsor to the minus pole and connect the crocodile clamps to the battery The battery cable and the battery sensor cable must have been connected to the same channel number 6 2 Steps to start a battery t...

Page 9: ...n the battery by increasing the discharge charge cycles If you do not wish to recondition the battery you can leave the default option to 1 The voltage 12V 24V is automatically detected 24V batteries...

Page 10: ...English 10 3 Start the test by the button Test battery channel x...

Page 11: ...harging v Ready vi Testing external charger b Actual battery voltage c Actual battery current d Discharge capacity compensated for temperature Between brackets is the capacity uncompensated for temper...

Page 12: ...he Results button The result list is shown as in this example At the left part of the screen the list of results comprehends a Red triangle in case the result has an error b Result sequence number c C...

Page 13: ...part of the screen the selected result is showed in more detail Uncompensated capacity average temperature during test and error description are additionally shown In case a flash drive FAT32 format...

Page 14: ...has an XLR connector Connect the SB50 XLR cable to one of the channels of the BTS instead of the cable with crocodile clamps Connect the charger to the XLR cable Switch on the charger 7 2 Steps to sta...

Page 15: ...each channel voltage current temperature status Results This cable can also be used for software update of the BTS 9 BTS advanced In the hardware overview screen the actual switches and measurements...

Page 16: ...er 05 Temperature high Insufficient cooling Leave more space around the BTS Other codes Contact your supplier Load error code Description Possible causes and solution s 01 FAN blocked Check if the fan...

Page 17: ...English 17...

Page 18: ...rge unit current 0 40A Internal discharge unit maximum power 600W Above 35 C ambient temperature the maximum discharge power is derated Battery discharge rate C5 20 200 Ah User configurable Supported...

Page 19: ...phase Gel 14 4V 12V or 28 8V 24V AGM 14 7V 12V or 29 4V 24V LiFePO4 14 4V 12V or 28 8V 24V Charge current post charge phase Gel 10 of main charge current AGM 25 of main charge current LiFePO4 no post...

Page 20: ...hold and similar electrical appliances Safety Part 2 29 Particular requirements for battery chargers EMC 204 108 EC EN 61326 1 Electrical equipment for measurement control and laboratory use EMC requi...