![Ivoclar Vivadent Programat EP 5010 Operating Instructions Manual Download Page 22](http://html1.mh-extra.com/html/ivoclar-vivadent/programat-ep-5010/programat-ep-5010_operating-instructions-manual_2097656022.webp)
22
4. Installation and Initial Start-Up
Press the
[Next]
button to confirm the self-test.
Before the first firing, the firing chamber should be dehumidified using the dehumidification program (see Chapter
5.4 for details).
Please note that the furnace may require a certain acclimation time after having been set-up. Particularly if the
furnace was exposed to considerable temperature changes (water condensation).