Operation and Maintenance Instructions
Envicooler
2001-03-09
Page 7
Air handling with the focus on LCC
3. Operating Instructions for Components and Assembled
Equipment
3.1 Regulations for Commissioning
All wiring shall be completed prior to commissioning.
The cooling medium and heating medium flows shall be adjusted according to spec-
ifications and these settings shall be entered in the Commissioning Report.
Only qualified technicians shall be allowed to commission the system according to an
accompanying checklist complete with commissioning record. A copy of the Commis-
sioning Record shall first be signed by the technician who has commissioned the unit,
then be signed by the seller and after that be sent in to IV Produkt. The validity of the
product warrantee is conditional on the system having been correctly commissioned.
No modifications in the machine are permissible during the warrantee period without
the approval by IV Produkt.
Follow the fault tracing directions in the fault tracing schedule before you contact a
service representative for servicing the unit under warrantee. This will prevent any un-
necessary service calls.