Installation
Model 710 TruBlue Installation, Operation, and Maintenance Manual
27
5. Allow the grout to set.
Item Description
1.
Baseplate
2.
Shims or wedges
3.
Grout
4.
Foundation
5.
Sleeve
6.
Dam
7.
Bolt
Figure 13: Pour grout into baseplate
6. Fill the remainder of the baseplate with grout, and allow the grout to set for at least 48
hours.
Item Description
1.
Baseplate
2.
Grout
3.
Foundation
4.
Dam
5.
Bolt
Figure 14: Fill remainder of baseplate with grout
7. Remove the leveling jackscrews after the grout hardens in order to remove any stress
points.
8. Tighten the foundation bolts.
9. Recheck the alignment.