1
2
6
7
3
Radius
100mm
4
5
40mm min.
500mm
o
45
max.
1 Upright
2 Sport Surface
3 Concrete Block
4 Ground Socket
GROUND SOCKET
Installation diagram
NET FITTING
Note ‘Socket bolt’ must be
inserted to prevent ingress of
soil into ground socket. Put a
dab of grease on it and insert
the screw into the hole and just
leave it in place. At any time in
the future it can be locked'.
GOAL POST
in ground socket
side view
SIDE VIEW
FRONT
OF POST
UPRIGHT
POST
VIEW FROM
SIDE
120mm
120mm
UPRIGHT
POST
SOCKET
POST
IN
SOCKET
ALLOW
SPACE
INSIDE
SOCKET
HERE
POST
FLUSH TO
FRONT OF
SOCKET
SIDE VIEW
BACK OF
POSTS
IMPORTANT- GROUND SOCKET
2
1
Twist 90 degrees to secure.
Position the fixings no more
than 340mm apart.
Fit into groove on goalpost
section.
TWIST & LOCK FIXINGS
WORLDWIDE © COPYRIGHT 2001 ITSA GOAL POSTS LTD, ALL RIGHTS RESERVED A REGISTERED DESIGN
WE RESERVE THE RIGHTS TO AMEND THE SPECIFICATIONS OF OUR SOCCER PRODUCTS IN THE INTEREST OF CONTINUED DEVELOPMENT. YOUR PRODUCT THEREFORE MAY DIFFER LIGHTLY TO THOSE ILLUSTRATED. E&OE
STEP 1
Attach the net to the twist and lock net fixings on the crossbar and
uprights. Fit the corners of the net to the top of each upright first then clip
the net onto all other net fixings.
STEP 2
With the steel net support pole laid flat on the floor attach the clip(B) to
the end/top of the net support pole. Lift the support pole in the air and
insert into the ground socket so that one pole is in place at one end.
STEP 3
With the first steel net support pole(A) in place, repeat this step and fit
the middle support pole and then the final end support pole.
STEP 4
All net support poles will be in place now with the net hanging loosely.
Now use the tension cord marked C to pull the box nets tightly to create a
tensioned straight box shape. Pull the cord back and down and wrap in a
figure of eight onto the cleat to hold in place. Repeat this step on each
pole.
Finally peg your goal net to the ground if the goal is being used on grass
or alternatively fit the net to the optional hinged net retainer - see separate
fitting instructions.
CLIP
CLEAT
TENSION
CORD
NET SUPPORT POLE
B
F
OPTIONAL
NET RETAINER
FLAT TO GROUND
FOLDED UPRIGHT
WITH CENTRAL SUPPORT
5 Drainage Hole
6. Socket Bolt
7. Pea Gravel
B
B1
120mm
Grey area on diagram denotes the space that should be present
once goal is inserted in socket. When fitting any ground socket,
tape the top over to prevent concrete dropping inside the socket
DURING INSTALLATION OF THE GROUND SOCKET. Locate
Upright locking screw to the back of the post when fitting.
For spare parts or additional products
call the goal-line
0114 2434200 or visit our online
supplier www.soccertackle.com
www.soccertackle.com
TO PURCHASE VIST
Protects paintwork at
the base of the
upright.
GOALPOST
PROTECTOR TAPE
AVAILABLE SEPARATELY
LOCKABLE GROUND
SOCKET CAPS
ARE AVAILABLE SEPARATELY
www.soccertackle.com
TO PURCHASE VIST
To cover and protect
Ground Socket
.
THREAD NET CORD INTO NET FIXINGS
INSERT SEPARATE ROD IN BETWEEN
EACH FIXING TO LOCK TO POST
OPTIONAL ROD
NET CORD