1
2
6
7
3
Radius
100mm
4
5
40mm min.
500mm
o
45
max.
1 Upright
2 Sport Surface
3 Concrete Block
4 Ground Socket
GROUND SOCKET
Installation diagram
NET FITTING
Note ‘Socket bolt’ must be
inserted to prevent ingress of
soil into ground socket. Put a
dab of grease on it and insert
the screw into the hole and just
leave it in place. At any time in
the future it can be locked'.
GOAL POST
in ground socket
side view
UPRIGHT
POST
VIEW FROM
SIDE
120mm
UPRIGHT
POST
SOCKET
POST
IN
SOCKET
SIDE VIEW
BACK OF
POSTS
IMPORTANT- GROUND SOCKET
2
1
Twist 90 degrees to secure.
Position the fixings no more
than 340mm apart.
Fit into groove on goalpost
section.
TWIST & LOCK FIXINGS
WORLDWIDE © COPYRIGHT 2001 ITSA GOAL POSTS LTD, ALL RIGHTS RESERVED A REGISTERED DESIGN
WE RESERVE THE RIGHTS TO AMEND THE SPECIFICATIONS OF OUR SOCCER PRODUCTS IN THE INTEREST OF CONTINUED DEVELOPMENT. YOUR PRODUCT THEREFORE MAY DIFFER LIGHTLY TO THOSE ILLUSTRATED. E&OE
STEP 1
Attach the net to the twist and lock net fixings on the crossbar and
uprights. Fit the corners of the net to the top of each upright first then clip
the net onto all other net fixings.
STEP 2
Insert the red safety pegs (optional) to peg your net to the ground, fit
corners first. Always insert pegs at an angle. When removing pegs use the
back of a peg to take out. Do remove pegs by pulling nets.
STEP 4
The net will have a net head cord. This is to lift the roof of the goal up
behind the crossbar. Wrap the cord on the top of the net support on one
side and tie off then go to the other side and pull tight and then wrap
around the top support and tie off.
CLIP
CLEAT
TENSION
CORD
NET SUPPORT POLE
B
C
D
A
F
OPTIONAL
NET RETAINER
STANDARD NET
OPTIONAL BOX NETS
WITH POLES
5 Drainage Hole
6. Socket Bolt
7. Pea Gravel
B
B1
Locate Upright locking
screw to the back of the
post when fitting.
For spare parts or additional products
call the goal-line
0114 2434200 or visit our online
supplier www.soccertackle.com
www.soccertackle.com
TO PURCHASE VIST
Protects paintwork at
the base of the
upright.
GOALPOST
PROTECTOR TAPE
AVAILABLE SEPARATELY
THREAD NET CORD INTO NET FIXINGS
INSERT SEPARATE ROD IN BETWEEN
EACH FIXING TO LOCK TO POST
OPTIONAL ROD
NET CORD
GROUND PEGS
LONGER GROUND PEGS ARE AVAILABLE SEPARATELY.
200mm
STANDARD
300mm
SOFTER GROUND
Longer pegs are to be used on
sandy or
Soft ground earth.
A risk
assessment of soil
conditions suitability
should be carried out when
anchors are to be used.
PEG
REMOV
AL
a
b
a
b