PM380/427LS User Manual
4. Advance preparation
Emergency stop equipment
⑤
MDR extension cables
(
Option
)
Model
ACE-CBL-K0600
ACE-CBL-K1200
L=
600mm
L=1200mm
ACE-CBL-K2700
L=2700mm
Necessary when the installing location of the MDR is far from that of the driver card.
■
CBL-402F
:
6-pin D shaped connector extension cable
■
Cables can be extended up to 3000mm, including the MDR cable length.
■
Do not extend cables by connecting multiple extension cables.
Devices to control this product, such as PLC
③
Control devices
6-pin D shaped connector extension cable
This product does not include the emergency stop equipment.
Customers must make sure to install it.
⑥
Emergency stop
equipment
Regarding equipment where this product is incorporated, check that a breaker with
appropriate capacity for the 24 VDC power supply unit has been installed. If abnormal
operation should occur, protection through the breaker could be effective.
Note that when using an earth leakage breaker, select one that is “inverter corre-
sponding”. Some inverter non-corresponding earth leakage breakers could result in
malfunction, since they may recognize high-frequency components of the switching
power supply as leakage.
Make sure that circuit breaker and safety circuit can be operated before moving
forward trial run.
①
Input to the DC power supply unit (AC power) is securely turned ON/OFF when
turning ON/OFF the breaker.
②
Input to the DC power supply unit is securely turned OFF/ON when turning
ON/OFF the safety circuit.
⑥-1
Checking the
breaker
⑥-2
Operation check
To this product
Emergency stop equipment
Breaker
24V DC
power supply
unit
AC power
Safety circuit
Safety precautions
Advance preparation
Check Product
Installation
Maintenance/Inspection
Specifications
④
Safety relay
1
5
2
6
4
3
1
6
3
5
4
2
L