MEASUREMENT AND ASSEMBLY MANUAL 

Validity of  the manual: 1. 8. 2016 

2.5.5. head-rail with engine 

A – Insert the head-rail from below onto both guiding rails and center it.  

ATTENTION: 

B – Keep in mind that the label is always facing the interior view. 

C – Secure the head-rail with securing hooks by tightening to guiding 
rails. 

 

 

 

 

2.5.6. Head-rail with engine – shaft connection 

A – Connect four-square shafts together with the connectors. 

B – Ensure the gap between the shafts is approximately 5 mm. 

C – Tighten the connectors. 

 

 

 

 

 

2.5.7. Engine connection 

A – First equip the engine with suitable mechanical end stop 
button. 

B – Connect the power supply (mounting) cable with engine cable. 

C – If the head-rail is delivered with polystyrene support, remove it. 

 

 

 

2.5.8. Slats 

A – Unpack the slats (avoid scratching!).  

B – Hang the highest and lowest slat and secure them with stainless clips. 

C – Seal rubber on the slat is facing always the exterior view. 

 

Summary of Contents for TITAN 90

Page 1: ...the lowest measured value for ordering and production of the blind ATTENTION Produced height of the blind TITAN VV is always 20 mm shorter compared to the measured one VZ The reason is ensuring manip...

Page 2: ...during measurement you will avoid possible problems during later assembly of the blind Installation into reveal A min 65 mm Spacing pad Assembly holes for guiding rails Blind height including assembly...

Page 3: ...MEASUREMENT AND ASSEMBLY MANUAL Validity of the manual 1 8 2016 3 VZ Blind height PP Number of punching T Upper punching position RP Distance between holes 2 ASSEMBLY...

Page 4: ...t coupling 2 pc 130 Head rail bracket x pc according to the blind width 400 450 Extension of front cover holder x pc according to the blind width 460 Screw M5x8 x pc according to the blind width 470 P...

Page 5: ...ht of screw head max 4 mm Fixing parts have to be enough strong and suitable for particular reveal 2 3 INSTALLATION TOLERANCE Parallelism of the guiding rails in all directions 1 mm Deviation from the...

Page 6: ...u have not misplaced right and left rail B Screw the screws through the guiding rail C Before tightening put the distance pad on the screw between lining and the rail D Tighten the screws and check th...

Page 7: ...connection A Connect four square shafts together with the connectors B Ensure the gap between the shafts is approximately 5 mm C Tighten the connectors 2 5 7 Engine connection A First equip the engine...

Page 8: ...of lintel or front cover stop the slats movement B Movement up is still possible for eventual setting C By moving the slats downwards the upper end limit is saved ATTENTION Do not change the lower end...

Page 9: ...onnect more than one engine with single control unit Functionality check A Using the mounting cable move the blind several times up and down B Check horizontal free motion of the slat side clips towar...

Reviews: