MEASUREMENT AND ASSEMBLY MANUAL
Validity of the manual: 1. 8. 2016
7
2.5.5. head-rail with engine
A – Insert the head-rail from below onto both guiding rails and center it.
ATTENTION:
B – Keep in mind that the label is always facing the interior view.
C – Secure the head-rail with securing hooks by tightening to guiding
rails.
2.5.6. Head-rail with engine – shaft connection
A – Connect four-square shafts together with the connectors.
B – Ensure the gap between the shafts is approximately 5 mm.
C – Tighten the connectors.
2.5.7. Engine connection
A – First equip the engine with suitable mechanical end stop
button.
B – Connect the power supply (mounting) cable with engine cable.
C – If the head-rail is delivered with polystyrene support, remove it.
2.5.8. Slats
A – Unpack the slats (avoid scratching!).
B – Hang the highest and lowest slat and secure them with stainless clips.
C – Seal rubber on the slat is facing always the exterior view.