![Isotech TWIST User Manual Download Page 21](http://html.mh-extra.com/html/isotech/twist/twist_user-manual_2093586021.webp)
21
2 )
Disassemble the finishing covers of the frames on both sides by removing the 4 screws that fix them
For ceiling mounting, proceed as follows:
1 )
Prepare the electrical connections as indicated in the relative paragraph, “connection to the electrical network” so that
the connections go out in correspondence with those on the back of the twist product. Any deviations can be managed in
the space provided between the twist module and the ceiling.
frame finish cover to be remo-
ved on both sides
3 )
Remove the first finishing frame paying attention on the right side (electrical connection side) to replace a screw to keep
the internal fan fixed in the same points in place.
first finishing frame
screw to be reassem-
bled after removing
the first frame
4 )
Remove the second finishing frame paying attention on the right side (electrical connection side) to replace a screw to
keep the internal fan fixed in the same points in place.
screw to be reassem-
bled after removing
the second frame
5)
Position the central central structure on the ceiling in the predefined position to mark the correspondence of the 4 fixing
points. References are also given in the paragraph on mechanical characteristics.
It is recommended to position the presence sensor towards the entrance to the room in which the equipment is ope-
rated.
Before proceeding, it is necessary to make sure that the fixing is suitable for the type of ceiling and the weight of the
equipment.
second finishing frame
On the engine side, the frame fixings
must both be removed