20 - 27
Wiring must comply with the electrical circuit diagram (Fig.9) of the lubrication unit
affixed inside the unit. Otherwise, property damage or serious injury can occur. Then fix the
cable gland to the housing (Fig.10) to prevent any pulling.
After the electrical connection is finished, tighten the cable gland and fix the cover. Then
turn on the power and the power indicator on the panel will lamp and start to pump if the
electrical connection is correct.
2-4.5 Deaerating
。
。
3 General information
Warning !To prevent chance of serious injury, death or property damage, disconnect the
product from main power supply before working on it.
Warning !Interval of startup remains at least 20 seconds up.
Warning !Intermittence time is at least 5 times of lubrication time.(Intermittence time
remains at least 3 minutes up).
Fig.11
The lubricant may only be conveyed if it is free
from bubbles. Fill the lubricant reservoir - if used -with
clean lubricant without allowing any bubbles to form.
For deaerating the compact unit/centralized lubrication
system, start running the compact unit until bubble-free
lubricant escapes from vent valve.
The process of deaerating the centralized
lubrication system is facilitated by:
1.Unscrew vent bolt(Fig. 11) until bubble-free
lubricant escapes from vent valve.
2.Filling longer pipe sections before connecting
the system to the lubricating point.
Summary of Contents for YGL-G
Page 16: ...16 27 Fig 1 ...