![ISE Ascent 2 Leg SB-ASC2-2-23-SM-DRMS Assembly/Installation Instructions Download Page 6](http://html1.mh-extra.com/html/ise/ascent-2-leg-sb-asc2-2-23-sm-drms/ascent-2-leg-sb-asc2-2-23-sm-drms_assembly-installation-instructions_2092445006.webp)
6 of 8
ISE | (800) 463-7731 www.ise-group.com
Attach Control Box & Connect Cables
Slide the Control Box (F) onto the Control Box Bracket on the Frame.
Connect the cable exiting the Leg (B) closest to the Control directly into the "M2" port on the Control Box (F).
Connect the cable from the other Leg (B) to the "M1" Control Box (F). For workcenters with widths greater
than 72" you may need to use the Leg Extension Cord (I) to reach the Control Box.
Connect the Switch (G) cable to the "HS" port on the Control Box (F).
Connect the Power Cord (H) to the "AC" port on the Control Box (F).
Use the adhesive-backed Cable Clips (O) to secure all cables so they stay up and out of the way.
Attach Switch
Attach the Switch (G) into pre-drilled holes,
or flush with the front desktop edge (or
recessed up to 1/8".) Place the Switch toward
an end so it does not interfere with your chair
when seated. Use two #12 × 9/16" Phillips
Head Wood Screws (N) to attach.
Do not
overtighten!
a
a
b
c
d
e
e
d
c
B
B
F
H
G
8
Control Box Bracket
B
H
B
G
"AC"
"M1"
"HS"
G
N
7
N
#12 × 9/16" Phillips Head
Wood Screw
Hardware at actual size
Do not overtighten screws
in this step. Overtightening
could cause damage to the
component.
b
F
"M2"