Ironwood FX 750 | User Manual
7
3.0 Delivery and Installation
3.1 Receiving Your Machine
You will be contacted to arrange delivery. Your machine will be
delivered by truck to your location. If there is no loading dock, be
sure that you have informed the carrier in advance so that they
deliver using a truck with a lift gate to lower the machine to
ground level.
Before accepting the machine and signing the bill of lading from
carrier, please inspect crating and machine condition, note potential
damage on the bill of lading, take pictures of potential damage, and
contact Stiles Machinery immediately.
The machine will arrive fully crated and secured to a pallet. Use a
hand truck or fork lift to move the machine on its pallet as close to
its final position as possible.
If you do not intend to install the Ironwood Shaper immediately after
delivery, store it in a protected, cool, and dry location.
The machine
arrives fully
crated. Remove
and save the
paperwork
attached to
the outside.
3.2 Unpack the Machine
TOOLS REQUIRED:
• Hammer
• Crowbar
Unpack as follows:
Do not remove the machine from the pallet.
1. Remove and save all paperwork attached to the outside of
the crate.
2. Remove the crating, starting with the top, then remove the four
sides. Use caution to avoid personal injury and prevent damage
to the machine’s finish.
3. Remove the protective plastic from the machine, starting at
the bottom.
Remove the
crating, starting
with the top,
then remove
the four sides.
Do not remove the protective paper that covers the
tabletop surface.
4. Remove the plastic sleeve from the front access door handle.
The door is locked when the handle is in the vertical position.
Turn the handle to the right to unlock and open the
access door.
5. Remove the hardware, accessories, and a tool kit that are
shipped inside the machine. If additional accessories are
ordered, such as a power feeder, they are delivered on
a separately.
6. Close and lock the front access door.
Remove the
parts stored
inside the
machine.