3
Step 7: Thread UPPER CABLE #26 over right top
pulley and connect the WEIGHT CARRIAGE #23 with
the SNAP HOOK #22. Set PULLEY #15a over the
cable and fit into the IDLER PULLEY HOUSING #30
with Allen Bolt #15b and Nut #15c. Leave hand tight
for now.
Step 8: Thread LOWER CABLE #27 under left bottom pul-
ley, through the tube hole and screw in the adjustment bolt
into the threaded hole in the BASE FRAME #9. Set PULLEY
#15a under the cable and fit into the IDLER PULLEY HOUS-
ING #30 with Allen Bolt #15b and Nut #15c. Leave hand tight
for now.
Step 5: Install SPRING #16 and WEIGHT CAR-
RIAGE #23 over SLIDE RAIL #17 as shown.
5
6
Spring
Weight Carriage
Step 6: Install pulleys #15a with black Allen bolts #15b and
hex nuts #15c onto TOP PULLEY BRACKET. Leave nuts
hand tight for now. Install TOP PULLEY BRACKET #25 onto
top of slide rail and front tube upright using bolts #1, washers
#3 and nuts #2 as shown.
Pulley
Front tube upright
Slide rail
Top Pulley
Bracket
Slide rail
Lower left
pulley
Upper cable
Idler Pulley
housing
Snap Hook
Install lower left pul-
ley only after cable is
threaded through the
tube hole, as front of
cable will not pass
with pulley in place.
Lower idle arm pulley to
be installed after cable is
threaded around pulley to
allow cable head to pass.
7
8
Weight
Carriage