Appearance upon completion of step 3.
3A. Fasten the Swing Tube (E) to hole on the underside of Front Support Tube (D)
using:
1 - (6) Hex Bolt M10x1.5x80L
2 - (51) Flat Washer D20xD11x2T
1 - (75) Nylon Nut M10x1.5x10T
3B. Align the Swing Tube (E) to the adjustment holes on the front of Front Support
Tube (D) and lock the two parts in place Using:
1 - (100) Pin D9.4x70
Thoroughly tighten the hardware once complete
STEP
3
14
Summary of Contents for AB Hyper Bench
Page 2: ......
Page 8: ...OVERVIEW DRAWING 6 ...
Page 9: ...HARDWARE PACK 7 ...
Page 11: ...9 ...
Page 19: ...NO 1 D2 STEP 4 17 20 Round 25 4xD65x 2PCS 4 d Cap x31 5 ...