WARNING
*BECAUSE OF THE SIZE AND WEIGHT OF THE SYSTEM, A MINIMUM OF
THREE ADULTS ARE REQUIRED FOR THE FOLLOWING STEPS*
STEP1
A. Slide a 18mm Thick Washer (U3) over each of the J-Bolts(U2) as shown in FIGURE 1A.
B. Remove the Padding from Main Post (A). Place the Main Post (A) over the J-Bolts. Slide a 18mm
Thick Washer(U3), a Lock washer M18 (U6) and thread a 18mm Hex Nut (U4) to each J-bolt.
Tighten the Nuts only a few turns onto the J-Bolts as shown in FIGURE 1B.
C. If the Main Post (A) is not exactly vertical, adjust the 18mm J-Bolt Hex Nuts(U4) located under the
Post base. Tighten all of the Hex Nuts(U4) Above Post base when Main Post(A) is vertical.
6
STEP2
A.
Tight the Small Extension Arm (C) to Main Extension
Arm by using 4pcs M10 x 30mm Hex Bolts (#4), 4pcs
Flat Washer M10 (#6), 4pcs Lock Washer M10 (#5) .
Do not tighten at this time.
4
5
6
B
C
FIGURE 1A
FIGURE 1B
U4
U6
U3
U3
U2
A