a. Dig  a  hole  48" deep and  21"x 21"square . The  edge  of  the  hole

should be flush with the edge of the playing surface. If you live in an area
where  heavy frost can occur, it may pose  a problem, consult your local
building inspector to determine the appropriate hole depth.

b. Build a form before pouring the concrete pad, to ensure that the top

of the concrete remains  straight  and  square. The form  should
be placed about 1/2" above the playing surface to allow for water drainage.

c. Bell out the bottom of the hole.

21"

21"

48"

NOTE: The hole must be at least 48" deep.

NOTE: A square hole prevents the rotation of the concrete.
NOTE: The  area  behind the playing surface must  be  cleared  off by at  least
3  feet to  enable the user to stand behind the pole to adjust the Rim  height.

NOTE: Before digging, call to locate any buried utility lines.

NOTE: At rim height 10

, distance from the face of backboard to the

front of Main Post(A) is 48

, Choose the proper location to dig

for the concrete footing:

STEP B

A. Thread  a  18mm Hex  Nut (U4) onto  each  of  the  18mm J-Bolts

(U2).Securely tighten the Nuts all the way down to the end of the
threads.

B. Slide  the  threaded end of  the  J-Bolts  through  the holes

in the Anchor Template (U1) and  secure  each J-Bolt  with a

18mm J-Bolt  Hex Nuts(U4) as shown. Securely tighten all Nuts
at this time.

U2

U4

NOTE: Make sure the curved

J

ends of the J-Bolts are

“ ”

oriented in a rectangular pattern, as shown.

4

U2

U4

U1

U4

Summary of Contents for HIGHLIGHT HOOPS HIL664

Page 1: ...n case you have to contact the manufacturer for replacement parts FAILURE TO COMPLY WITH ANY OF THE WARNINGS IN THESE INSTRUCTIONS MAY RESULT IN SERIOUS PERSONAL INJURY FAILURE TO COMPLY MAY ALSO RESULT IN PROPERTY DAMAGE PLEASE HEED ALL WARNINGS AND CAUTIONS TO ENSURE YOUR SAFETY DO NOT ATTEMPT TO ASSEMBLE THIS SYSTEM WITHOUT CAREFULLY READING AND FOLLOWING ALL INSTRUCTIONS BEGIN BY IDENTIFYING A...

Page 2: ... THESE SAFETY INSTRUCTIONS MAY RESULT IN SERIOUS INJURY OR PROPERTY DAMAGE AND WILL VOID THE WARRANTY The owner must ensure that all players know and follow these rules to safely operate the system Proper and complete assembly use and supervision is essential for proper operation and to reduce the risk of accident or injury A high probability of serious injury exists if this system is not installe...

Page 3: ...eel U1 1 Anchor Template U2 4 18mm Anchor J bolts U3 8 Thick washer for J bolts U4 12 Hex nut M18 U5 4 Anchor Rebar 36 L U6 4 Lock Washer M18 R1 4 Carriage bolt M10x70 R2 4 Flat Washer M10 R3 4 Flange nut M10 ITEM QTY DESCRIPTION 1 6 Hex bolt M16x200mm 2 12 Flat Washer M16 3 6 Lock nut M16 4 4 Hex Bolt M10x30mm 5 4 Lock washer M10 6 4 Flat washer M10 HARDWARE LIST PARTS LIST RIM HARDWARE UNDERGROU...

Page 4: ...ncrete NOTE The area behind the playing surface must be cleared off by at least 3 feet to enable the user to stand behind the pole to adjust the Rim height NOTE Before digging call to locate any buried utility lines NOTE At rim height 10 distance from the face of backboard to the front of Main Post A is 48 Choose the proper location to dig for the concrete footing STEP B A Thread a 18mm Hex Nut U4...

Page 5: ...ly to eliminate any air bubbles in the concrete Lift the Template slightly above the concrete when agitating Make sure the Template is resting on the concrete after agitating Form the concrete into a downward slope away from the Pole to allow water runoff d Clean off any concrete that may be on the J Bolt Template or the exposed portions of the J Bolts e Using a carpenter s level make sure the Tem...

Page 6: ...8 U6 and thread a 18mm Hex Nut U4 to each J bolt Tighten the Nuts only a few turns onto the J Bolts as shown in FIGURE 1B C If the Main Post A is not exactly vertical adjust the 18mm J Bolt Hex Nuts U4 located under the Post base Tighten all of the Hex Nuts U4 Above Post base when Main Post A is vertical 6 STEP2 A Tight the Small Extension Arm C to Main Extension Arm by using 4pcs M10 x 30mm Hex B...

Page 7: ...the top edge of Main Extension Arm plate with 10FT line on Main Post Remove the nuts and washers from pre installed bolts on backboard frame Connect Backboard frame to Extension Arm Assembly B C using removed nuts and washers B B C E B A A D D 1 2 2 3 Remove the nuts and washers from pre installed bolts on backboard frame Attach backboard frame to Main Extension arm using removed nuts and washers ...

Page 8: ...tory assembled Slide 4 Carriage bolts M10x70mm R1 rim hardware kit thru Rim plate Spacers and Backboard secure with 4 Flat washers M10 R2 Rim hardware kit and 4 Flange nuts M10 R3 Rim hardware kit from the backside of Backboard Re attach Spring box cover to the Rim with removed screws NOTE Use a level to make sure rim is level side to side before tightening nuts C F G E R1 R2 R3 ...

Reviews: