Even-GLO
TM
Series GA301
Page 7
Rev. July/2012
2 - Pre-installation Overview
What You Need to Supply
1. Heater post anchoring hardware.
2. Materials necessary to construct a concrete base for floor mounting.
3. Gas supply line that is installed to the Gas and Electric Supply according to the:
National Fuel Gas Code, ANSI Z.223.1 (NFPA 54) in the US and Natural Gas and
Propane Installation Code, CSA B149.1 or Propane Storage and Handling Code,
B149.2 in Canada.
4. Electrical supply rated at 24 Vac with two stage control.