Rapidly going through a program

It is possible to go through the program rapidly by pressing " 

 " (that is if acceleration " 

ACCL

 " is selected

in the "preprogram").

The seconds on the display are counted down faster. This acceleration is interrupted each time you come to an

important step (drain, cooldown, etc.). Then press the acceleration button to continue rapidly.

By means of this button it is possible to skip parts or the rest of the program.

It is not possible to advance the program during tumbling.

Programmed stop

When a time stop is programmed, the program will stop in that segment. The water remains in the tub, there is

no more drum rotation and the display shows “ StoP “.

After pressing the “START” button once more, the program resumes.

Stop with predetermined stop time.

If a predetermined stop time was programmed, the display will alternately show

 “ StoP.tiME “

 and the

remaining stop time counting down. After the stop time has elapsed, the program will resume automatically.

The stop time can also be interrupted by pressing the “START” button.

Alarm signal.

If the alarm signal was programmed, this will be executed at the beginning of the stop time.This can be

interrupted by pushing the " START ", or the " STOP "button.

å

Soaking (SoAH)

When a soak is programmed, the program will stop in that segment. The water level will be brought to “ 25 “,

the temperature will be kept constant and there will be one left-right drum rotation every 3 minutes.

After pressing the “START” button once more, the program resumes.

å

Soak with predetermined soak ti

me.

If a predetermined soak time was programmed, the display will alternately show "

 SoAh.tiME

"and the

remaining soak time counting down. After the soak time has elapsed, the program will resume automatically.

The soak time can also be interrupted by pressing the “START” button.

Alarm signal.

If the alarm signal was programmed, this will be executed at the beginning of the soak time. This can be

interrupted by pushing the " START ", or the " STOP "button.

å

å

Control of a program in progress

By pressing the " T " button for

 longer than 3 seconds

 

and then letting go

 of this button, all steps that are put

in per program segment will be shown one after the other 

during 1 second

. By pressing " T " once more 

and

keeping it depressed

, the

 last step displayed

 is shown during this time span. After letting go of the " T " button

the next steps will be displayed.

At the end of a program segment " 

EntEr

 " will appear for about 3 seconds. If you want to proceed to the display

of the following segment, you must keep the " E " button depressed during this period. If not, the normal program

process will be displayed.

Operating mode

6

Summary of Contents for PC30

Page 1: ...23456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 1234567890123456789012 12345678901234567890...

Page 2: ...elect a program 60 To start a program 60 Programmed start 61 Changing to another program 61 One time modification of the level wash time and temperature input 61 Control of the temperature 61 Control of a program in progress 61 Rapidly going through a program 62 Programmed stop 62 Soaking 62 Time stop 62 Interruption and stopping the program 63 Adding water 63 Draining water 63 Heating the bath 63...

Page 3: ...12 64 Error 13 64 ES tilt XX 13 R Ram full 15 33 39 S S XX 17 SE i 7 SoAH 25 62 SoAh tiME 62 SoAH XXX 25 SoAP XX 63 SourCE XX 39 SoX tXXX 63 SP XX 17 SP2 X 27 SPI X 27 SPin 27 StArt 3 StoP 25 62 StoP tiME 62 StoP XXX 25 T t XX 15 19 t C 11 t XX 19 61 t F 11 t XXXX 29 t XX C 61 t1 XXX 21 td XXX 27 Tu XXX 31 W WASh 29 X XX del 33 XX YY 39 XX del 33 XX inS 33 XX Cool 25 XX CYt i 15 XX dEti 27 XX teMP...

Page 4: ... frequently used Below you can find an explication of the applied symbols This gives a presentation of a text that appears on the display These symbols with rounded off corners stand for pressing the appropriate keys on the keyboard e g numbers start stop etc X stands for a number of your choice The symbols in rectangulars stand for mechanical interventions that need to be executed e g turning the...

Page 5: ...6 Pre programmeer mode Programmeer mode Kopieer mode Bediening mode Hoofdstuk 3 Hoofdstuk 4 Hoofdstuk 5 Hoofdstuk 6 ...

Page 6: ...assembly of the machine so that it usually needn t be altered anymore If the key switch in the front is not set to PROG Error 00 flashing will appear for about 10 seconds after E 6 1 9 is put in Programming mode In this mode you can put in step by step the data necessary to obtain a complete wash cycle of your own choice To get into the programming mode Put the key switch in the front in the PROG ...

Page 7: ...8 ...

Page 8: ...xisting wash program XXX XX Price of the program e g 120 00 The amount due for this program Insert the necessary coins in the coin meter s After each insertion the amount still due will appear on the display Once the full amount has been inserted StArt will appear again Press START to start the program ...

Page 9: ...10 ...

Page 10: ...ram Altering the Preprogram Press E HF Machine of type HF WE245 304 or high spin WE machine FC Frequency controlled frequency controlled motor Coin machine with coin mechanism First put in the value of the coin meter with the highest value by means of X X X If necessary move the decimal point by pressing START By pressing E you can proceed to the other coin meters and install them in the same mann...

Page 11: ...12 ...

Page 12: ...lve Inlet valve i2 Soft tub i1 Soft hopper 1 i4 Warm tub i2 Soft hopper 2 i6 Hard tub i3 Soft hopper 3 i8 i4 Hard hopper 4 i1 Soft prewash i5 Hard hopper 5 i3 Warm main wash i6 Hard hopper 6 i5 Hard conditioner i7 Soft tub i7 i8 Warm tub i9 Hard tub ...

Page 13: ...14 ...

Page 14: ...tion Mod filling procedure consisting only of modulation no heating system If no hot water inlet valves were selected see SE i HEAt will automatically be selected and HEAt SYS will not be displayed HECo Execute heating control temperature control This function will temporarily stop the program while the water is being heated to the programmed temperature GEntlE The action and stop times of the dru...

Page 15: ...16 ...

Page 16: ... end of a program or soak cycle However this reduces the number of soap exits from 6 to 5 The following steps will not be displayed on the WE machines On all WE machines the preprogramming is now finished and the display returns to StArt iS tilt XX Intermediate Spin unbalances Indicate the number of unbalances allowed during intermediate spin from 1 to 15 before the spin cycle is skipped ES tilt X...

Page 17: ...18 ...

Page 18: ...change the price of another program By pressing STOP once more one can immediately proceed to StArt This enables you to modify the amount without running through the entire program XX id XX Program number and Number of program segment The first XX stands for the program number which is put in with ProG The second XX stands for the number of the segment of the program Example 02 id 03 stands for pr...

Page 19: ...20 ...

Page 20: ...otor transition to SP XX SP XX Speed Put in the rpm speed of the wash cycle 10 to 50 rpm with X X Press E XX tEMP Temperature temperature of the bath Press E C XX Temperature Or F XX C or F according to the setting in the Preprogramming Indicate the temperature maximum 95 C with X X and press E If a cold wash bath is desired select 0 Now the display will immediately show XX SE i The next step will...

Page 21: ...22 ...

Page 22: ... 4 or i1 Inlet 1 Inlet valve 1 HFP machine Choose using NO if an inlet valve should be selected or not Subsequently press E to continue to the next inlet valve In order to save space not all inlet valves are drawn here The action involved are identical to the first inlet A description of the function of each inlet valve is provided in chapter 3 If because of the selection of the wrong inlet valves...

Page 23: ...24 ...

Page 24: ...t SoAP and press E SoI Liquid soap injection 1 Choose with NO wether an inlet valve should be selected or not Then press E t1 XXX Time 1 Duration of the soap injection 1 Put in the duration maximum 999 seconds with X X X Press E to continue to the next soap injection Only the blocks of So1 So2 So5 and So6 are drawn to save space The others So3 and So4 are identical ...

Page 25: ...26 ...

Page 26: ... put in at XX tEMP the level can be chosen between 0 and 50 Overflow Very dirty linen Put in 0 C or in F at XX tEMP Then select no HECo and choose level 00 when L XX appears The machine will now continuously take water and drain it via the overflow during the entire wash time LECo Level control If no level control is desired select no LECo and press E If level control is desired select LECo and pr...

Page 27: ...28 ...

Page 28: ... stop time with X X X between 0 and 999 minutes and confirm by pressing E If 0 was selected the program will stop indefinitely until the START button is pressed again ALArm XXX At the beginning of this stop time the alarm signal can be activated Select the duration of the alarm signal using X X X between 0 and 250 seconds This option is only displayed if ALArm was selected during the preprogrammin...

Page 29: ...30 ...

Page 30: ...00 RPM d1 Drain 1 Drain valve 1 Select d1 or d2 with NO and confirm with E d2 Drain 2 Drain valve 2 SP2 X Duration high spin Put in the duration of high spin maximum 15 minutes with X and press E If no high spin is desired put in 0 The next step depends on the selection made during preprogramming With no FC frequency controlled motor transition to XX dEti With FC frequency controlled motor transit...

Page 31: ...32 ...

Page 32: ... using NO the movement of the drum during draining of the water WASh diSt JoLt and DrAin Press E to confirm WASh Wash action during drain diSt Distribution distribution speed not for machines type WE no HF Distribution of washload during drain Jolt Short spin 10 seconds low spin after distribution Introduce for this purpose minimum 60 seconds with Drain Drain Drain no action Drain of water without...

Page 33: ......

Page 34: ...achines the speed will be equivalent to the lowest programmed speed in that program Select the tumble time using X X X from 30 to 999 sec and press E to confirm If no tumbling is required 0 can be selected There will then be a waiting time of 1 minute at the end of the program ALArm XXX Here the alarm can be activated again Select the duration of the alarm signal using X X X between 0 and250 secon...

Page 35: ......

Page 36: ...r once more The program segment 03 must be put in again The previous segment 03 moves up to 04 and the previous 04 will become 05 If there is not enough space in the Ram memory the error message Ram full will appear To delete a program segment Press STOP XX del flashing delete Press E The program segment XX will now be deleted The following program segments will move back one place Example Program...

Page 37: ......

Page 38: ...between 0 and 29 so you can use them as a structure for a new program This saves a lot of time when you want to program various simular programs CoPY PrG Copy program To confirm press E To cancel press any other key Transition to StArt SourCE XX Program to be copied Put in the number of the program to be copied with X X and confirm with E dESt YY Destination destination of the copied program Put i...

Page 39: ...light up To stelect one of the standard programs 30 to 39 you must put in 20 and 10 afterwards Example program 35 put in 5 20 10 3 leds light up å å XX XX XX e g 01 41 15 When the machine is taking water the first decimal point will light up As long as there is also a level control active this decimal point will flash XX XX X X e g 01 41 1 5 When the bath is been heated the second decimal point wi...

Page 40: ...ore starting this program press NO first and then press E while keeping NO depressed For each program segment L XX followed by t XX and then C XX will appear on the display Adjust the data if necessary and press E to continue to the wash time and temperature input of the next segment When all input is adapted according to your requirements press START to initiate the program Remark The values of L...

Page 41: ...utton å Soaking SoAH When a soak is programmed the program will stop in that segment The water level will be brought to 25 the temperature will be kept constant and there will be one left right drum rotation every 3 minutes After pressing the START button once more the program resumes å Soak with predetermined soak time If a predetermined soak time was programmed the display will alternately show ...

Page 42: ...own in dX LXX This information is displayed for 3 seconds after the button is released This function does not work during the first 3 minutes of a program Heating the bath By keeping the button 10 depressed during a program the heating is activated Max 95 C While pressing this button the temperature of the bath is shown with C XX or F XX This function does not work during the first 3 minutes of a ...

Page 43: ...rting the total operating hours are shown during 5 seconds In case of a coin op machine coin will also appear after 3 seconds followed by the number of received coins during 5 seconds Overview of the total amount of steps per program By entering E 7 8 8 before starting a program the display will show the first program number and the the total amount of steps in that program Example Prg 01 08 Progr...

Page 44: ...45 ...

Page 45: ...rmo magnetic motor protection closed To control the next entry press E To control the previous entry press NO To stop this test press the STOP button Test 2 Control of the DIP switches on the main print board In this test it is possible to verify whether the switches are open or closed In case of a machine type HF WE245 304 or WE high spin these DIP switches are used to determine how long the spin...

Page 46: ...inlet I5 Exit 20 water inlet I4 Exit 21 water inlet I3 Exit 22 water inlet I2 Exit 23 water inlet I1 Exit 24 soap inlet 6 Exit 9 high spin Exit 10 low spin Exit 11 distribution speed Exit 12 wash action right Exit 13 wash action left Exit 14 heating Exit 15 water inlet cool down Exit 16 water inlet I8 Exit 1 soap inlet 1 Exit 2 soap inlet 2 Exit 3 soap inlet 3 Exit 4 soap inlet 4 Exit 5 soap inlet...

Page 47: ...nnection connect the wires directly on the print board next to the ground wire connection option Connect as indicated on the wiring diagram The two connectors on the right give a tension of 220V max 4A which can be applied to drive 220V soap pumps If more than 4A is required an external tension will have to be used 6 connections have been provided of which one S6 can be used to drive a waterproofi...

Page 48: ...programs Program 30 Hot wash 1 40 90 Program 31 Wamr Wash 40 60 Program 32 Synthetisch 1 35 40 Program 33 Synthetisch 2 40 Program 34 Fijne was 30 30 Program 35 Wol 20 Program 36 Dekbed 30 40 Program 37 Gordijnen 30 40 Program 38 Stijven Program 39 Kookwas 2 40 90 Warme tussenspoeling ...

Page 49: ...ERATURE HEAT SYS HEATING CONTROL WASH ACTION SOFT TUB WARM TUB HARD TUB SOFT VOORWAS WARM PREWASH HARD CONDITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 41 30 30 ...

Page 50: ...WARM SYS TEMP STURING WASBEWEGING ZACHT BAK 1 ZACHT BAK 2 ZACHT BAK 3 HARD BAK 4 HARD BAK 5 HARD BAK 6 ZACHT KUIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name ...

Page 51: ... TEMPERATURE HEAT SYS HEATING CONTROL WASH ACTION SOFT TUB WARM TUB HARD TUB SOFT VOORWAS WARM PREWASH HARD CONDITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name ...

Page 52: ...WARM SYS TEMP STURING WASBEWEGING ZACHT BAK 1 ZACHT BAK 2 ZACHT BAK 3 HARD BAK 4 HARD BAK 5 HARD BAK 6 ZACHT KUIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name ...

Page 53: ...NDITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 01 41 30 Hot wash 7 14 2 2 2 12 12 15 15 15 3 3 3 3 3 41 41 41 41 41 40 90 0 0 0 X X 3 7 X X X X X X X X X 13 10 20 20 16 10 10 13 13 13 1 1 1 1 500 500 500 500 X 30 X X X X 7 1000 30 30 30 60 8 30 14 30 3 30 3 30 11 30 ...

Page 54: ...KUIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 01 41 30 Hot wash 7 14 2 2 2 12 12 15 15 15 3 3 3 3 3 28 28 28 28 28 40 90 0 0 0 X X 3 7 X X X X X X X X X 20 20 25 25 20 20 20 25 25 20 1 1 1 1 400 400 400 400 X 30 X X X X 7 800 30 30 30 60 8 30 14 30 3 30 3 30 11 30 ...

Page 55: ...DITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 30 41 30 Hot wash 1 7 14 2 2 2 12 12 15 15 15 3 3 3 3 3 41 41 41 41 41 40 90 0 0 0 X X 3 7 X X X X X X X X X 13 10 20 20 16 10 10 13 13 13 1 1 1 1 500 500 500 500 X 30 X X X X 7 1000 30 30 30 60 8 30 14 30 3 30 3 30 11 30 ...

Page 56: ...UIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 30 41 30 Hot wash 1 7 14 2 2 2 12 12 15 15 15 3 3 3 3 3 28 28 28 28 28 40 90 0 0 0 X X 3 7 X X X X X X X X X 20 20 25 25 20 20 20 25 25 20 1 1 1 1 400 400 400 400 X 30 X X X X 7 800 30 30 30 60 8 30 14 30 3 30 3 30 11 30 ...

Page 57: ...ITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 31 41 30 Warm wash 7 14 2 2 2 12 12 15 15 15 3 3 3 3 3 41 41 41 41 41 40 60 0 0 0 X X 3 7 X X X X X X X X X X 13 10 20 20 16 10 10 13 13 13 1 1 1 1 500 500 500 500 X 30 X X X X 7 1000 30 30 30 60 8 30 14 30 3 30 3 30 11 30 ...

Page 58: ...IP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 31 41 30 Warm wash 7 14 2 2 2 12 12 15 15 15 3 3 3 3 3 28 28 28 28 28 40 60 0 0 0 X X 3 7 X X X X X X X X X X 20 20 25 25 20 20 20 25 25 20 1 1 1 1 400 400 400 400 X 30 X X X X 7 800 30 30 30 60 8 30 14 30 3 30 3 30 11 30 ...

Page 59: ...D CONDITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 32 27 30 Synthetics 1 4 10 2 2 2 10 10 12 12 12 4 4 4 4 4 41 41 41 41 41 35 40 0 0 0 X X X X X 2 4 X X X X X X X X X X 13 13 20 20 16 10 10 13 13 13 2 400 30 30 30 30 X X X X X 2 800 60 4 30 10 30 2 30 2 30 7 30 ...

Page 60: ...ZACHT KUIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 32 27 30 Synthetics 1 4 10 2 2 2 10 10 12 12 12 4 4 4 4 4 28 28 28 28 28 35 40 0 0 0 X X 2 4 X X X X X X X X X X 20 20 25 25 20 20 20 25 25 20 2 350 30 30 30 30 X X X X X 2 700 60 4 30 10 30 2 30 2 30 7 30 ...

Page 61: ... VOORWAS WARM PREWASH HARD CONDITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 33 19 30 Synthetics 2 8 2 2 2 10 10 10 10 5 5 5 5 35 35 35 35 35 0 0 0 X 3 X X X X X X X 13 20 20 16 10 13 13 13 3 500 30 30 30 X X X X 30 8 30 2 30 2 30 5 30 30 ...

Page 62: ...HARD BAK 5 HARD BAK 6 ZACHT KUIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 33 19 30 Synthetics 2 8 2 2 2 10 10 10 10 5 5 5 5 25 25 25 25 35 0 0 0 X 3 X X X X X X X 20 25 25 20 20 25 25 20 3 400 30 30 30 X X X X 30 8 30 2 30 2 30 5 30 30 ...

Page 63: ...EWASH HARD CONDITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 34 22 Gentle wash 4 7 2 2 2 3 3 5 5 5 10 10 10 10 10 30 30 30 30 30 30 30 0 0 0 X X 2 3 X X X X X X X X 20 20 20 20 16 13 13 13 13 13 2 500 30 30 30 30 X X X X X 30 4 30 7 30 2 30 2 30 4 30 30 ...

Page 64: ... BAK 6 ZACHT KUIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 34 22 Gentle wash 4 7 2 2 2 3 3 5 5 5 10 10 10 10 10 25 25 25 25 25 30 30 0 0 0 X X 2 3 X X X X X X X X 25 25 25 25 20 25 25 25 25 20 2 400 30 30 30 30 X X X X X 30 4 30 7 30 2 30 2 30 4 30 30 ...

Page 65: ...FT VOORWAS WARM PREWASH HARD CONDITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 35 18 30 Cold wash 9 2 2 2 3 3 3 6 12 12 12 12 25 25 25 25 20 0 0 0 X 3 X X X X X X 18 18 18 16 13 13 13 13 1 400 30 30 30 X X X X 30 9 30 2 30 2 30 3 30 30 ...

Page 66: ... 4 HARD BAK 5 HARD BAK 6 ZACHT KUIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 35 18 30 Cold wash 9 2 2 2 3 3 3 6 12 12 12 12 22 22 22 22 20 0 0 0 X 3 X X X X X X 25 25 25 20 25 25 25 20 1 350 30 30 30 X X X X 30 9 30 2 30 2 30 3 30 30 ...

Page 67: ...PREWASH HARD CONDITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 36 22 Duvet 6 6 2 2 2 5 5 5 5 5 10 10 10 10 10 30 30 30 30 30 35 40 0 0 0 X X 2 2 X X X X X X X X X 20 20 20 20 20 10 10 15 15 15 1 500 30 30 30 30 X X X X X 30 6 30 6 30 2 30 2 30 3 30 30 ...

Page 68: ...RD BAK 6 ZACHT KUIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 36 22 Duvet 6 6 2 2 2 5 5 5 5 5 10 10 10 10 10 25 25 25 25 25 35 40 0 0 0 X X 2 2 X X X X X X X X X 25 25 25 25 25 25 25 25 25 25 1 400 30 30 30 30 X X X X X 30 6 30 6 30 2 30 2 30 3 30 30 ...

Page 69: ...M PREWASH HARD CONDITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 37 26 Curtains 14 2 2 2 2 2 2 2 2 2 10 10 10 10 10 25 25 25 25 25 30 0 0 0 0 X X 7 X X X X X X X 20 20 20 20 20 8 8 10 10 10 1 350 30 30 30 30 X X X X X 30 14 30 2 30 2 30 2 30 3 30 30 ...

Page 70: ...HARD BAK 6 ZACHT KUIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 37 26 Curtains 14 2 2 2 2 2 2 2 2 2 10 10 10 10 10 22 22 22 22 22 30 0 0 0 0 X 7 X X X X X X X 25 25 25 25 25 25 25 25 25 25 1 300 30 30 30 30 X X X X X 30 14 30 2 30 2 30 2 30 3 30 30 ...

Page 71: ...CONTROL WASH ACTION SOFT TUB WARM TUB HARD TUB SOFT VOORWAS WARM PREWASH HARD CONDITIONER SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 38 12 30 Starch 3 15 2 41 0 X X 9 9 1 500 X 7 1000 60 12 30 ...

Page 72: ...ING ZACHT BAK 1 ZACHT BAK 2 ZACHT BAK 3 HARD BAK 4 HARD BAK 5 HARD BAK 6 ZACHT KUIP WARM KUIP HARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 38 12 30 Starch 3 15 2 41 0 X X 18 18 1 400 X 7 800 60 12 30 ...

Page 73: ...R SOAP INJECTION LEVEL LEVEL CONTROL ADD PROGRAM LOW SPIN DRAIN HIGH SPIN DELAY TOTAL TIME TRUMBLE ALARM Program Total time Name 7 2 14 2 2 2 12 10 12 15 15 15 3 4 3 3 3 3 42 42 42 42 42 42 40 90 90 0 0 0 X X X 3 7 X X X X X X X X X X 13 10 10 20 20 16 10 10 10 13 13 13 1 1 1 1 500 500 500 500 X 30 30 X X X X X 7 1000 30 30 30 60 8 30 2 30 14 30 3 30 3 30 11 30 ...

Page 74: ...ARD KUIP ZEEPINJECTIE PEIL PEILSTURING PROG UITBREID LAAGZWIEREN AFVOER HOOGZWIEREN VRIJLOOP TIJD ONTWARREN ALARM Program Total Time Name 39 44 Hot wash 2 7 2 14 2 2 2 12 10 12 15 15 15 3 4 3 3 3 3 28 28 28 28 28 28 40 90 90 0 0 0 X X X 3 7 X X X X X X X X X X 22 20 20 25 25 20 22 20 20 25 25 20 1 1 1 1 400 400 400 400 X 30 30 X X X X X 7 800 30 30 30 60 8 30 2 30 14 30 3 30 3 30 11 30 ...