Page 2
Use
– For use only in complete equipment or final applications where the acceptability of the combination is deter-
mined by Underwriters Laboratories, Inc.
These components have been judged on the basis of the required spacings in the Standard for Emergency Lighting
and Power Equipment UL 924, Sec. 29, which covers the end use product for which the component was designed.
CONDITIONS OF ACCEPTABILITY
1. Installed in a suitable ultimate enclosure.
2. Used with marked electrical ratings.
3. Provide with proper spacing between live parts and enclosure and/or adjacent devices.
4. Factory wired only (terminations not suitable for field wiring).
5. Temperature tests may have to be repeated where battery temperature exceeds 55° C.
6. Mounted within the end-use product such that the battery is secured and the test switch operates properly
when the end product is fully assembled.
7. End-use products employing one or more of these devices are to be marked in accordance with the Standad-
for Emergency Lighting and Power Equipment, UL 924.
INSTALLATION INSTRUCTIONS
CAUTION: Before installing, make certain the A.C. power is off and the ILB-CP unit
connector is disconnected.
1. FIXTURE
The
ILB-CP
can be used with most LED loads that operate at 10-60 VDC. See the
ILB Model Specification
Chart
for output specifications of the unit being installed.
2. MOUNTING THE ILB
Mount the
ILB-CP
in the driver/lamp compartment or enclosed wireway so the wire leads are not exposed, at least
½
″
away from the driver. Mount the
ILB-CP
using the mounting holes provided. The insulating barrier should be
mounted against the fixture wall. Then the main circuit board can be mounted leaving a space between the board
and the mounting barrier. The circuit board should be placed so that no live parts are accessible during routine
maintenance or relamping.
The battery should be at least
1
/
2
″
from the A.C. ballast and other heat sources. Since heat rises, try to mount the
battery as low as possible.
CAUTION
– Connect the battery to the unit before applying A.C. power.
3. WIRING
Refer to the wiring diagram on the back page for the appropriate wiring of the LED load and driver. Install in ac-
cordance with the National Electrical Code and local regulations. For additional wiring diagrams consult Cus-
tomer Service.
4. INSTALLING THE THREADED BODY TEST SWITCH (TBTS)
Select a convenient location on the side of the fixture so that the
TBTS
can be seen after installation. Allow for
proper clearance and drill or punch a ½
″
hole. Remove the nut from the
TBTS
. Push the
TBTS
housing into the
½
″
hole and secure with the nut. Connect the LED wires from the unit to the
TBTS
(Red/Black or Red w/tag to
Red, and White/Red to White). For proper operation, use only the accessory components provided with the unit
.
See Page 1 of the Instruction Manual.
ILB-CP05
ILB-CP07
ILB-CP10
5 WATTS
7 WATTS
10 WATTS
ILB MODEL SPECIFICATION CHART
OUTPUT POWER (CONSTANT)
ILB-CP12
12 WATTS
ENGINEERING CONSIDERATIONS
INSURE WIRING IS IN ACCORDANCE WITH THE NATIONAL ELECTRICAL CODE AND LOCAL REGULATIONS.