![Invest ISP 2.0 Installation Manual Download Page 14](http://html1.mh-extra.com/html/invest/isp-2-0/isp-2-0_installation-manual_2085184014.webp)
1:Channel steel 2:Collector fixing hook 3:Collector connector
(
There is a wrong mark in the
drawing
)
4:Prepared bolt 5:Bolt 6:Nut
Step 1: Build M12 bolt 4 onto roof with concrete;
If bolt 4 is not built in on the roof in advance, the collector can be fixed with an expansion bolt during
mounting, but waterproofing measures shall be taken.
H
Summary of Contents for ISP 2.0
Page 5: ...4 CollectorDrowning and dimensions mm 3...
Page 12: ...F...
Page 16: ...1 Collector 2 Collector fixing hook 3 Channel steel 4 Rubber pad J...
Page 17: ...2 Color steel roof K...
Page 24: ...1 When the collector is mounted to the external wall vertically R...
Page 26: ...2 When the collector is mounted to the external wall not vertically T...
Page 29: ...Pipeline connection 1 Connection proposal for solar system with 1 panel W...
Page 36: ......