11. Cabling
Check that cabling will not be subject to wear, corrosion, excessive pressure, vibration,
sharp edges or any other adverse environmental effects. The check shall also take into
account the effects of aging or continual leaks. A halide torch (or any other detector using a
naked flame) shall not be used
12. Detection of flammable refrigerants
Under no circumstances shall potential sources of ignition be used in the searching for or
detection of refrigerant leaks. A halide torch (or any other detector using a naked flame)
shall not be used.
13. Leak detection methods
The following leak detection methods are deemed acceptable for systems containing
flammable refrigerants.
Electronic leak detectors shall be used to detect flammable refrigerants, but the sensitivity
may not be adequate, or may need re-calibrated.(Detection equipment shall be calibrated
in a refrigerant-free area.) Ensure that the detector is not a potential source of ignition and
is suitable for the refrigerant used. Leak detection equipment shall be set at a percentage
of the LFL of the refrigerant and shall be calibrated to the refrigerant employed and the
appropriate percentage of gas(25% maximum )is confirmed .
Leak detection fluids are suitable for use with most refrigerants but the use of detergents
containing chlorine shall be avoided as the chlorine shall be avoided as the chlorine may
react with the refrigerant and corrode the copper pipe work.
If a leak is suspected, all naked flames shall be removed/extinguished.
If a leakage of refrigerant is found which requires brazing, all of the refrigerant shall be
recovered from the system, or isolated (by means of shut off valves) in a part of the system
both before and during the brazing process.
14. Removal and evacuation
When breaking into the refrigerant circuit to make repairs- or for any other purpose –
conventional procedures shall be used. However, it is important that best practice is
followed since flammability is a consideration. The following procedure shall be adhered to:
remove refrigerant;
purge the circuit with inert gas;
evacuate;
purge again with inert gas;
open the circuit by cutting or brazing;
The refrigerant charge shall be recovered into the correct recovery cylinders. The system
shall be “flushed’ with OFN to render the unit safe. This process may need to be repeated
several times. Compressed air or oxygen shall not be used for this task.
Flushing shall be achieved by breaking the vacuum in the system with OFN and continuing
to fill until the working pressure is achieved, then venting to atmosphere, and finally
pulling down to a vacuum. This processing shall be repeated until no refrigerant is
within the system. When the final OFN charge is used, the system shall be vented down
to atmospheric pressure to enable work to take place. This operation is absolutely vital
if brazing operations on the pipe-work are to take place. Ensure that the outlet for the
vacuum pump is not close to any ignition sources and there is ventilation available.
15. Charging procedures
In addition to conventional charging procedures, the following requirements shall be
followed.
-Ensure that contamination of different refrigerants does not occur when using charging
equipment. Hoses or lines shall be as short as possible to minimize the amount of
Summary of Contents for CF-WUHI-16L
Page 2: ...LANGUAGES ENGLISH 3 33 ROMANA 65...
Page 34: ...34 GR 1 l 220 240V 50Hz l l l 30 l l l l l l l 8 l l l l l l l l l...
Page 35: ...35 GR l l l l l l l l l l l l l l l 24...
Page 36: ...36 GR 2 l l l l l l l l PCB T 3 15A 250V 350V 3 l 2002 96 EC 27 2003 l CO2 l A B...
Page 37: ...37 GR 4 R290 l l To R290 l l R290 R290...
Page 38: ...38 GR 5 SN D2002255780115715200209 SN D2002255780115715200209 A SN...
Page 39: ...39 GR A 1 30cm 40cm 2 5 C 5 C 5 C 35 C 30 90 3 4 2 5...
Page 40: ...40 GR 6 HEPA...
Page 48: ...48 GR 8 O O O TIMER Hi 91 Hi 90...
Page 51: ...51 GR 10 1 2...
Page 52: ...52 GR x x...
Page 53: ...53 GR 15 11 l o l 2 l HEPA 30...
Page 54: ...54 GR 12 24 13 HEPA 45 55...
Page 55: ...55 GR display 5 C 41 F...
Page 56: ...56 GR l l l l l l l l l l l l l l l l l l l l l l l C1 C2 C8 3 C...
Page 57: ...57 GR POWER 10 14 R290 1 2 3 4 CO2 5...
Page 58: ...58 GR 6 7 8 9...
Page 59: ...59 GR 10 11 12 13 O LFL 25 14...
Page 60: ...60 GR 15 16...
Page 61: ...61 GR 80 17 18...
Page 62: ...62 GR 19 20 21 22...
Page 63: ...63 GR 211 300 3300 www inventoraircondition gr media library...
Page 95: ......