![inVENTer av100 Installation And Operating Instructions Manual Download Page 16](http://html.mh-extra.com/html/inventer/av100/av100_installation-and-operating-instructions-manual_2083906016.webp)
16
PREPARATIONS PRIOR TO INSTALLATION
aV100 extract air system – Avio N 100
•
Installation and operating instructions
Inner cover
Figure 15: Dimensioned drawing of inner cover Avio N 100
3.3
Installation conditions
During installation, ensure the following conditions are met in order to ensure safe and fault-free
operation of the aV100 extract air system:
Electrical protection areas in bathrooms in accordance with VDE 0100
DANGER
Ingress of water into aV100 extract air system or its components/power source.
Electric shock and overheating due to short circuit (230V, 50Hz)!
►
Install aV100 extract air system outside electrical protection area 0.
►
Install hygrostat outside electrical protection areas 0 to 2.
►
Install light switch/switch/pushbutton outside electrical protection areas 0 to 2.
Figure 16: Overview of electrical protection areas in bathrooms in accordance with VDE 0100
1 Panel inner cover
2 Inner cover base plate retaining screw
3 Fan casing
4 Inner cover base plate
5
Airflow cone
159
159
80
36
Ø
99
1
5
1
2
3
4
2
1 aV100 extract air system
2 Light switch/switch/pushbutton
Area 2
Area 1
Area 0
2250
600
2
1