250
PO
S AVE THESE INSTRUCTIONS
(250PO) SPA (JET + HARD WATER) ENGLISH 7.5” X 10.3” PANTONE 295U 06/12/2015
English
Page 10
SET UP (continued)
7.
Disconnect the in
fl
ation hose
(7)
from the air valve and the in
fl
ation pump, and attach the pressure
gauge
(5)
to the air valve. The pressure gauge indicator should be in the green area for a properly
in
fl
ated spa tub
(see drawing 6)
. Repeat previous steps to add more air if necessary.
8.
Replace the air valve cap back.
NOTE:
The cap is designed to be screwed on and off. Never exert force as this could cause the
complete internal in
fl
ation system of the valve to come loose. See “Spa Tub Air Valve Fastening” for
valve
maintenance.
Infl ate the Spa Cover Air Bladder
1.
Open the in
fl
ation valve and insert one end of the in
fl
ation hose
(7)
into the valve, the other end to the
electric air pump; turn on the pump to in
fl
ate until the air bladder is
fi
rm to the touch but not hard
(see
drawing
7).
2.
Disconnect the in
fl
ation hose
(7)
from the the valve and the electric air pump.
3.
Close and recess the in
fl
ation valve.
NOTE:
If there is a need to add some air to the spa tub wall or spa cover air bladder after they have been
setup, refer to above “In
fl
ate the Spa Tub Wall” and “In
fl
ate the Spa Cover Air Bladder” sections. The cover
air bladder is preinstalled inside the spa cover. If it needs to be reinstalled, place the unin
fl
ated air bladder
inside the spa cover lip before in
fl
ating the bladder.
For outdoor infl ation:
For outdoor use, it’s recommended to use manual pump to in
fl
ate the spa tub and cover air bladder.
5
7
4
7
1
2
7
7
6
5
1
2
6.
Turn off the electric air pump. Disconnect the in
fl
ation hose
(7)
from the electric air pump, then connect
it to the manual pump to in
fl
ate the spa tub for 1 - 2 minutes
(see drawing 5)
.
IMPORTANT:
Do not over in
fl
ate or use high pressure air compressor to in
fl
ate.
7
3.2
3.1