292
IO
S AVE THESE INSTRUCTIONS
(292IO) BUBBLE SPA WITH POOL ENGLISH 7.5” X 10.3” PANTONE 295U 07/15/2016
English
Page 9
SET UP (continued)
Setup the spa with at least 2 persons.
1.
Move the entire package to the selected site. Do not drag the spa tub across the ground as this can
cause damage and leakage.
Open the carton carefully as this carton can be used to store the spa during long term storage or when
not in use.
2.
Lay out all the parts on the ground and make sure all the parts are accounted for. For missing or
damaged parts contact the appropriate Intex Service Center listed in the separate “Authorized service
Centers”
sheet.
3.
Estimated assembly time 45 minutes. (Note the assembly time is only approximate and individual
assembly experience may vary.)
Spa Control Unit Assembly
1.
Connect the control panel
(3)
cable plug into the receptacle on top of the spa control base and screw in
the plug cover
fi
rmly by hand
(see drawing 1)
.
2.
Screw the control panel bolts
(4)
with the provided bolt wrench
(6)
to secure the control panel
(see
drawing
2)
.
3.
Plug the spa control unit into an electrical outlet.
Spa Benches Assembly
1.
Take out the ground cloth
(19)
and spread it over the cleared area. Then spread out the spa liner over
the ground cloth and point the drain valve towards a suitable draining area.
Note:
Spread the ground
cloth with the bubbles facing down over the cleared area where you intend to setup your spa.
2.
The tub liner and benches are to remain de
fl
ated to facilitate the assembly of the lateral support. There
are 2 straps on each side; insert the L shape U legs
(33)
through the spa lateral lowest strap sleeves
(see drawing 3)
.
3.
Slide the bench belt loops located at the back through the L shape U legs vertical pipes
(see drawing 4)
.
4
3
4
6
2
1
3
1
2