20
440 01 1051 02
Specifications are subject to change without notice.
INLET
EXHAUST
IN
ON
OFF
VENT
Figure 12
Upflow Installations Vent through Left Side
Coupling & Clamps
(Optional)
25
−
24
−
81
Single Pressure
Switch
Dual Pressure Switch Detail
Tee Trap White PVC
(loose parts bag)
On Some Models
ONLY
Plastic Cap
Yellow or black
Vent Drain
& Clamps
Rotate downward
5
to 10
NOTE:
Built-in channel will
be angled 5
°
to 10
°
also.
SIDE VIEW
AIR
FLOW
AIR
FLOW
Representative drawing only, some models may vary in appearance.
2
(50.8mm) PVC
Coupling
Either: The PVC
Drain Tee or a field
supplied 2
(50.8mm) PVC Tee
Drain Tube
Black Rubber
1
/
2
(12.7mm) ID
& Clamps
Drain Tube
Corrugated
5
/
8
(15.9mm)
ID
& Clamps
Drain Connector Black PVC
3
/
4
(19.1mm) PVC X
1
/
2
(12.7mm) CPVC
(Loose parts bag)
Casing Grommet
Black Rubber
5
/
8
(15.9mm)
ID
(Loose parts bag)
Drain Line Vent Tee
3
/
4
(18.1mm) PVC or
1
/
2
(12.7mm) CPVC (Field supplied)
Relief Tube
Black Rubber
3
/
16
(4.8mm) ID
Upflow Installations Vent through Left Side
(See Figure 12)
Remove drain tee from inducer discharge and remove black drain
tube
1
/
2
″
(12.7mm) ID from bottom of drain tee.
Install Vent Pipe grommet in side of casing.
Cut an appropriate length of 2
″
(50.8mm) PVC pipe long enough
to exit the cabinet and connect the vent drain to either:
•
A standard field supplied 2
″
(50.8mm) PVC tee, or
•
A 2
″
(50.8mm) PVC coupling fastened onto the drain tee.
Install tee trap into bottom of tee.
Remove knockout from the side of the furnace casing where drain
tube will exit.
Install the
1
/
2
″
(12.7mm) CPVC street elbow on discharge of trap
Install the black PVC drain connector [
3
/
4
″
(19.1mm) PVC x
1
/
2
″
CPVC from loose parts bag] as shown in the illustration above.
Cut the black drain tube [
5
/
8
″
(15.9mm) ID
−
in loose parts bag] to
length to fit between trap and tube connector through grommet.
Clamp both ends of the drain tube using clamps provided.
Glue the CPVC street elbow to the trap using appropriate cleaner
and solvent cement.
Connect the tee trap and the main drain line exiting the casing as
shown in
Figure 20
.
Note:
It is recommended that all PVC piping and fitting
connections be fit up and inspected before final cementing.
Both
the internal trap and the external tee trap must be primed
before operation.
Verify all condensate drain connections are
securely clamped. A coupling and clamps (in loose part bag) may
be installed as shown for future servicing of the vent system.