background image

 
SPECIFICATIONS: 
 
*  Weight ...................................................................................... 1 lb 4 ounces 
*  Height ....................................................................................... 5” with Nozzle 
*  Depth........................................................................................ 4” 
*  Width ........................................................................................ 2 ¼” 
*  Electrical Requirement ............................................................. 24 VAC 
 
Upon receiving valve unpack and inspect for shipping damage.  If damage is 
found, notify shipping agent immediately.  At this time, inspect for any missing 
parts and if parts are missing notify factory. 
 
The PF-2-PB has been designed to fit in place of any existing FT, FT-II, PF or 
PFC-II valve.  On International Carbonic Inc. equipment no modification of 
existing valve plates will be necessary.  If valve is to be mounted on other than 
International Carbonic Inc. equipment notify factory for required template. 
 
TO CONVERT AN EXISTING SINGLE FLAVOR UNIT TO A TWO FLAVOR 
VALVE: 
 

1.  Shut off CO2, and water, then disconnect syrup from valve to be 

converted. 

 

2.  Disconnect electrical supply to unit to be modified, either at electrical 

outlet or valve key switch. 

 

3.  Install additional syrup cooling coil in the water bath system or plumb into 

extra syrup cooling pass on cold plate systems to obtain necessary 
cooling.  Note:  In some juice applications cooling the syrup will not be 
necessary. 

 

4. Remove 

existing 
standard 
valve and 
replace with 
PF-2-PB.  
All PF-2-PB 
valves have 
alignment 
pins, see 
illustration.  
These 
alignments 
pins may 

not fit on older valve mounting plate.  If that is the case the alignment pins 
may be removed with a sharp knife.  Align valve body with mounting plate 
and attach with supplied valve mounting screws. 

Mounting Plate Hole

Mounting Plate Hole

S2

S1

W

REAR VIEW 

Alignment Pin

Alignment Pin

Inlet Screw Hole

Inlet Screw Hole

Syrup #1

Syrup #2

Water

Summary of Contents for PF-2-PB

Page 1: ...PUSH TO SERVE PUSH TO SERVE PF 2 PB INSTALLATION AND BRIXING PROCEDURES ICI INTERNATIONAL CARBONIC INC 16630 Koala Rd Adelanto California 92301 800 854 1177 12 16 05...

Page 2: ...off CO2 and water then disconnect syrup from valve to be converted 2 Disconnect electrical supply to unit to be modified either at electrical outlet or valve key switch 3 Install additional syrup coo...

Page 3: ...t syrup lines and check for leaks Repeat this procedure for water or soda connection 7 Connect 24 volt wire to transformer or existing 24 volt lead wire Insert plug into electrical receptacle or turn...

Page 4: ...io of water vs syrup This ratio can and will vary with differing products but in most cases it is a 5 TO 1 ratio 5 Make sure system is in an operating condition i e high pressure regulators are set wa...

Page 5: ...3 E 527 STEM SOLENOID VALVE 6 3 E 730 PLUNGER SPRING ASSEMBLY 7 3 E 531 GASKET SOLENOID STEM 8 1 E 591 BODY TWIST LOCK 9 2 E 162 SCREW TAP TIGHT 10 2 E 240 1 2 SCREW 11 3 E 137 O RING INLET TUBE 12 3...

Page 6: ...6 4 4 E 1061 SWITCH TWO FLAVOR ASSY SYM QTY PART NO DESCRIPTION 1 1 E 1066 CAP COVER ALL 2 1 E 1072 CONTROL BOX 3 2 E 1063 SWITCH MOUNTING PLATE 4 2 E 157 SUB MINIATURE SWITCH 5 2 E 1070 SPRING 3 97...

Page 7: ...IONAL CARBONIC INC ADELANTO CALIFORNIA TITLE DATE DRN BY CHK BY APPR BY PF 2 PB ELECTRICAL SCHEMATIC 12 16 05 GLW ICI 24 VOLT C NO NC C NO NC YELLOW YELLOW RED RED BLUE BLUE SYRUP COIL 1 WATER COIL SY...

Page 8: ...6...

Reviews: